Laserfiche WebLink
I1 n. More than one Proposal is submitted for the same project from a Bidder <br /> 2 under the same or different names. <br /> I 3 <br /> 4 2. A Proposal may be considered irregular and may be rejected if: <br /> 5 a. The Proposal does not include a unit price for every Bid item; <br /> I 6 b. Any of the unit prices are excessively unbalanced (either above or below the <br /> 7 amount of a reasonable Bid) to the potential detriment of the Contracting <br /> 8 Agency; <br /> 9 c. Receipt of Addenda is not acknowledged; <br /> I 10 d. A member of a joint venture or partnership and the joint venture or <br /> 11 partnership submit Proposals for the same project (in such an instance, both <br /> 12 Bids may be rejected); or <br /> II 13 e. If Proposal form entries are not made in ink. <br /> 14 <br /> 15 COE 1-02.14.DOCX <br /> I 16 1-02.14 Disqualification of Bidders <br /> 17 (City of Everett) <br /> 18 <br /> I 19 Revise this section to read: <br /> 20 <br /> 21 A Bidder will be deemed not responsible if the Bidder does not meet the mandatory bidder <br /> I22 23 responsibility criteria in RCW 39.04.350(1), as amended, and noted in 1-02.1(1). <br /> 24 <br /> 25 1-02.15.RTF <br /> I26 1-02.15 Pre Award Information <br /> 27 (August 14, 2013 APWA GSP) <br /> 28 <br /> I 29 Revise this section to read: <br /> 30 <br /> 31 Before awarding any contract, the Contracting Agency may require one or more of these <br /> I 32 items or actions of the apparent lowest responsible bidder: <br /> 33 1. A complete statement of the origin, composition, and manufacture of any or all <br /> 34 materials to be used, <br /> I 35 2. Samples of these materials for quality and fitness tests, <br /> 36 3. A progress schedule (in a form the Contracting Agency requires) showing the order <br /> 37 of and time required for the various phases of the work, <br /> 38 4. A breakdown of costs assigned to any bid item, <br /> 39 5. Attendance at a conference with the Engineer or representatives of the Engineer, <br /> 40 6. Obtain, and furnish a copy of, a business license to do business in the city or county <br /> 41 where the work is located. <br /> 42 7. Any other information or action taken that is deemed necessary to ensure that the <br /> 43 bidder is the lowest responsible bidder. <br /> I 44 <br /> 45 <br /> 46 1-03.GR1 <br /> I 47 Award and Execution of Contract <br /> 48 <br /> I <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 9 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br /> I <br />