My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I1 n. More than one Proposal is submitted for the same project from a Bidder <br /> 2 under the same or different names. <br /> I 3 <br /> 4 2. A Proposal may be considered irregular and may be rejected if: <br /> 5 a. The Proposal does not include a unit price for every Bid item; <br /> I 6 b. Any of the unit prices are excessively unbalanced (either above or below the <br /> 7 amount of a reasonable Bid) to the potential detriment of the Contracting <br /> 8 Agency; <br /> 9 c. Receipt of Addenda is not acknowledged; <br /> I 10 d. A member of a joint venture or partnership and the joint venture or <br /> 11 partnership submit Proposals for the same project (in such an instance, both <br /> 12 Bids may be rejected); or <br /> II 13 e. If Proposal form entries are not made in ink. <br /> 14 <br /> 15 COE 1-02.14.DOCX <br /> I 16 1-02.14 Disqualification of Bidders <br /> 17 (City of Everett) <br /> 18 <br /> I 19 Revise this section to read: <br /> 20 <br /> 21 A Bidder will be deemed not responsible if the Bidder does not meet the mandatory bidder <br /> I22 23 responsibility criteria in RCW 39.04.350(1), as amended, and noted in 1-02.1(1). <br /> 24 <br /> 25 1-02.15.RTF <br /> I26 1-02.15 Pre Award Information <br /> 27 (August 14, 2013 APWA GSP) <br /> 28 <br /> I 29 Revise this section to read: <br /> 30 <br /> 31 Before awarding any contract, the Contracting Agency may require one or more of these <br /> I 32 items or actions of the apparent lowest responsible bidder: <br /> 33 1. A complete statement of the origin, composition, and manufacture of any or all <br /> 34 materials to be used, <br /> I 35 2. Samples of these materials for quality and fitness tests, <br /> 36 3. A progress schedule (in a form the Contracting Agency requires) showing the order <br /> 37 of and time required for the various phases of the work, <br /> 38 4. A breakdown of costs assigned to any bid item, <br /> 39 5. Attendance at a conference with the Engineer or representatives of the Engineer, <br /> 40 6. Obtain, and furnish a copy of, a business license to do business in the city or county <br /> 41 where the work is located. <br /> 42 7. Any other information or action taken that is deemed necessary to ensure that the <br /> 43 bidder is the lowest responsible bidder. <br /> I 44 <br /> 45 <br /> 46 1-03.GR1 <br /> I 47 Award and Execution of Contract <br /> 48 <br /> I <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 9 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.