My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Public Notification I <br /> 2 The Contractor shall furnish and install the "No Trespassing" signs shown in the <br /> 3 Plans at locations staked by the Engineer at least 72 hours prior to performing I <br /> 4 site cleanup or any potentially hazardous Work (such as clearing or operating <br /> 5 equipment). <br /> 6 <br /> 7 At the same time that "No Trespassing" signs are posted, provide written <br /> 8 notification of the following to the Engineer and to the chief law enforcement <br /> 9 officer of the local governmental entity where the Work will occur: <br /> 10 <br /> 11 1. The precise location of each area that is posted "No Trespassing"; <br /> 12 <br /> 13 2. The date and time that each site was posted "No Trespassing"; I <br /> 14 <br /> 15 3. The date, time, description and duration of the Work to be performed <br /> 16 at each site. I <br /> 17 <br /> 18 At least 72 hours prior to performing site cleanup in Work areas containing <br /> 19 encampments (such as tents, makeshift dwellings, sleeping sites, or I <br /> 20 accumulations of personal property that are not refuse), the Contractor shall post <br /> 21 a notification at each encampment area. Each notice shall: <br /> 22 I <br /> 23 1. Be weather resistant, and written in both English and Spanish. <br /> 24 <br /> 25 2. Be affixed to each dwelling or post mounted within 10-feet of each <br /> 26 encampment; <br /> 27 <br /> 28 3. State the Prime Contractor's company name as the entity that <br /> 29 performed the cleanup as required by the Washington State <br /> 30 Department of Transportation; <br /> 31 <br /> 32 4. Provide the date that the notice is posted; I <br /> 33 <br /> 34 5. Provide date(s) and time(s) that cleanup will occur; <br /> 35 <br /> 36 6. Provide the telephone number, business hours and physical address <br /> 37 of the location where stored personal property may be claimed. <br /> 38 <br /> 39 7. State that personal property will be stored for 70-days from the date of <br /> 40 removal, and if unclaimed within that time, will be disposed of. <br /> 41 <br /> 42 At the same time that notifications are posted at encampment areas, provide I <br /> 43 written notification of the schedule to perform site cleanup to the Engineer and <br /> 44 to the following advocacy groups: <br /> 45 <br /> 46 *** <br /> 47 Community Outreach & Enforcement Team Sargent: <br /> 48 John Zeka <br /> 49 425-257-7411 <br /> 50 jzeka@everettwa.gov <br /> 51 *** <br /> 52111 <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 22 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.