Laserfiche WebLink
1 5. The CHSP shall identify measures for screening and managing workers or <br /> 2 visitors to areas identified in the CHSP. The plan shall include procedures <br /> 3 should a person exhibit symptoms of COVID-19. I <br /> 4 <br /> 5 6. The CHSP shall identify how the plan will be updated as new work activities <br /> 6 are added with each two week look-ahead schedule. The CHSP updates I <br /> 7 shall identify the number of workers, crews, work tasks, and the degree of <br /> 8 congestion or confinement workers will experience for the work activities in <br /> 9 the two week look-ahead schedule. <br /> 10 <br /> 11 7. The CHSP shall include how the Contractor will ensure everyone on the site <br /> 12 has been trained on the CHSP requirements. This includes subcontractors, <br /> 13 suppliers, and anyone on the project site. <br /> 14 <br /> 15 COVID-19 Health and Safety Plan (CHSP) Inspection <br /> 16 The Contractor shall grant full and unrestricted access to the Engineer for CHSP <br /> 17 Inspections. The Engineer (or designee) will conduct periodic compliance <br /> 18 inspections on the project site, staging areas, or yards to verify that any ongoing work <br /> 19 activity is following the CHSP plan. If the Engineer becomes aware of a I <br /> 20 noncompliance incident either through a site inspection or other means, the <br /> 21 Contractor will be notified immediately (within 1 hour). The Contractor shall <br /> 22 immediately remedy the noncompliance incident or suspend all or part of the I <br /> 23 associated work activity. The Contractor shall satisfy the Engineer that the <br /> 24 noncompliance incident has been corrected before the suspension will end. <br /> 26 <br /> 26 1-07.7.GR1 <br /> 27 Load Limits <br /> 28 <br /> 29 1-07.7 INST1.GR1 <br /> 30 Section 1-07.7 is supplemented with the following: <br /> 31 <br /> 32 1-07.7.OPT6.GR1 <br /> 33 (March 13, 1995) <br /> 34 If the sources of materials provided by the Contractor necessitates hauling over roads <br /> 35 other than State Highways, the Contractor shall, at the Contractor's expense, make all I <br /> 36 arrangements for the use of the haul routes. <br /> 37 <br /> 38 1-07.9.GR1 <br /> 39 Wages <br /> 40 <br /> 41 1-07.9(1).GR1 <br /> 42 General <br /> 43 <br /> 44 1-07.9(1),INST1.GR1 <br /> 45 Section 1-07.9(1) is supplemented with the following: <br /> 46 <br /> 47 1-07.9(1).OPT1.GR1 <br /> 48 (January 6, 2020) <br /> 49 The Federal wage rates incorporated in this contract have been established by the <br /> 50 Secretary of Labor under United States Department of Labor General Decision No. <br /> 51 WA20200001. <br /> 52 <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 26 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />