Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 During nonworking hours equipment or materials shall not be within the WZCZ I <br /> 2 unless they are protected by permanent guardrail or temporary concrete barrier. <br /> 3 The use of temporary concrete barrier shall be permitted only if the Engineer <br /> 4 approves the installation and location. <br /> 5 <br /> 6 During actual hours of work, unless protected as described above, only <br /> 7 materials absolutely necessary to construction shall be within the WZCZ and <br /> 8 only construction vehicles absolutely necessary to construction shall be allowed <br /> 9 within the WZCZ or allowed to stop or park on the shoulder of the roadway. <br /> 10 <br /> 11 The Contractor's nonessential vehicles and employees private vehicles shall not <br /> 12 be permitted to park within the WZCZ at any time unless protected as described <br /> 13 above. <br /> 14 <br /> 15 Deviation from the above requirements shall not occur unless the Contractor <br /> 16 has requested the deviation in writing and the Engineer has provided written <br /> 17 approval. <br /> 18 <br /> 19 Minimum WZCZ distances are measured from the edge of traveled way and will <br /> 20 be determined as follows: <br /> 21 <br /> Regulatory Distance From <br /> Posted Speed Traveled Way III <br /> (Feet) <br /> 35 mph or less 10 <br /> 40 mph 15 III <br /> 45 to 50 mph 20 <br /> 55 to 60 mph 30 <br /> 65 mph or greater 35 <br /> 22 <br /> 23 Minimum Work Zone Clear Zone Distance <br /> 24 <br /> 25 1-07.23(1).OPTS.FR1.DOCX <br /> 26 (January 5, 2015) <br /> 27 Lane closures are subject to the following restrictions: i <br /> 28 <br /> 29 *** <br /> 30 1. At least one 11-foot lane shall remain open to traffic at all times on Mukilteo 1 <br /> 31 Blvd W. Short term disruptions and impacts resulting in temporary closure <br /> 32 under flagging operation of Mukilteo Blvd. W is allowed, however these <br /> 33 closures shall be limited be no more than 3 minutes in duration no more I <br /> 34 than once every 15 minutes. During these temporary closures, provisions <br /> 35 shall be made to allow safe and immediate access for emergencies and first <br /> 36 responders through the area during these closures. Lane closures and <br /> 37 shifts are permitted as described in the following items of this list with the <br /> 38 use of flaggers and following the requirements in Section 1-10.2. An <br /> 39 approved traffic control plan is required. <br /> 40 <br /> 41 2. Single lane closures with alternating one-way traffic are allowed on the <br /> 42 bridge between the hours of 7am and 3pm during the weekdays with the <br /> 43 use of flaggers and following the requirements in Section 1-10.2. Safe and I <br /> 44 immediate access for emergencies and first responders shall be maintained <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 58 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />