My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Combined Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
8/5/2020 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
7/22/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Tracking Number
0002373
Total Compensation
$509,293.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Capital Contract Change Order 2 Combined Construction Inc
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Combined Construction Inc. 2/10/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 the street Right of Way by no later than 9:00 AM the first Working Day I <br /> 2 following completion. This notification requirement includes partial or full <br /> 3 lane closures, parking restrictions, sidewalk closures, detours, complete or <br /> 4 partial street closures, shoulder work, and pedestrian rerouting, as well as <br /> 5 the placing of building Materials or equipment on City streets, sidewalks, or <br /> 6 alleys. <br /> 7 *** <br /> 8 <br /> 9 If the Engineer determines the permitted closure hours adversely affect traffic, the <br /> 10 Engineer may adjust the hours accordingly. The Engineer will notify the Contractor <br /> 11 in writing of any change in the closure hours. <br /> 12 <br /> 13 Lane closures are not allowed on any of the following: <br /> 14 <br /> 15 1. A holiday, <br /> 16 1 17 2. A holiday weekend; holidays that occur on Friday, Saturday, Sunday or <br /> 18 Monday are considered a holiday weekend. A holiday weekend includes <br /> 19 Saturday, Sunday, and the holiday. <br /> 20 <br /> 21 3. After *** 11:00 PM *** on the day prior to a holiday or holiday weekend, and <br /> 22 <br /> 23 4. Before *** 5:00 AM *** on the day after the holiday or holiday weekend. <br /> 24 <br /> 25 1-07.24.RTF <br /> 26 1-07.24 Rights of Way <br /> 27 (July 23, 2015 APWA GSP) <br /> 28 <br /> 29 Delete this section and replace it with the following: <br /> 30 <br /> 31 Street Right of Way lines, limits of easements, and limits of construction permits are <br /> 32 indicated in the Plans. The Contractor's construction activities shall be confined within <br /> 33 these limits, unless arrangements for use of private property are made. <br /> 34 <br /> 35 Generally, the Contracting Agency will have obtained, prior to bid opening, all rights of <br /> 36 way and easements, both permanent and temporary, necessary for carrying out the <br /> 37 work. Exceptions to this are noted in the Bid Documents or will be brought to the <br /> 38 Contractor's attention by a duly issued Addendum. <br /> 39 <br /> 40 Whenever any of the work is accomplished on or through property other than public <br /> 41 Right of Way, the Contractor shall meet and fulfill all covenants and stipulations of any <br /> 42 easement agreement obtained by the Contracting Agency from the owner of the private <br /> 43 property. Copies of the easement agreements may be included in the Contract <br /> 44 Provisions or made available to the Contractor as soon as practical after they have been <br /> 45 obtained by the Engineer <br /> 46 <br /> 47 Whenever easements or rights of entry have not been acquired prior to advertising, <br /> 48 these areas are so noted in the Plans. The Contractor shall not proceed with any portion I <br /> 49 of the work in areas where right of way, easements or rights of entry have not been <br /> 50 acquired until the Engineer certifies to the Contractor that the right of way or easement is <br /> 51 available or that the right of entry has been received. If the Contractor is delayed due to <br /> 52 acts of omission on the part of the Contracting Agency in obtaining easements, rights of <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 60 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.