Laserfiche WebLink
1 The unit Contract price per linear foot for"Removing Existing Drainage Pipe" shall be full <br /> 2 pay for performing the Work as specified, including saw cutting and disposal. <br /> 3 <br /> 4 "Removing Drainage Structure", per each. <br /> 5 The unit Contract price per each for "Removing Drainage Structure" shall be full pay to <br /> 6 perform the Work as specified, including completely removing items, furnishing and I <br /> 7 placing backfill material, compacting the voids, saw cutting, and disposing of the items. <br /> 8 <br /> 9 DIVISION6.GR6 <br /> 10 Division 6 <br /> 11 Structures <br /> 13 <br /> 13 6-02.GR6 <br /> 14 Concrete Structures <br /> 15 <br /> 16 6-02.INST1.DOCX <br /> 17 Section 6-02 is supplemented with the following: <br /> 18 <br /> 19 6-02.SA1.DOCX <br /> 20 (******) <br /> 21 Cleaning and Anti-Graffiti Coating I <br /> 22 Description <br /> 23 This work shall consist of cleaning and applying anti-graffiti coating to affected areas of the I <br /> 24 existing bridge structure, including the East and West Abutments, Piers 1 and 2, and Span 1 <br /> 25 and 3 girders. The work shall also consist of applying anti-graffiti coating to all exposed <br /> 26 surfaces of the new concrete catcher blocks. <br /> 27 <br /> 28 Materials <br /> 29 The anti-graffiti coating will meet the requirements of Section 9-08, "Anti-Graffiti Coating", as I <br /> 30 modified by these Special Provisions. <br /> 31 <br /> 32 Construction Requirements <br /> 33 The areas of the bridge affected by graffiti shall be cleaned in a manner that removes existing <br /> 34 graffiti without damaging the structure. <br /> 35 II36 Once clean and dry, anti-graffiti coating shall be applied per the requirements of Section 9-08, <br /> 37 "Anti-Graffiti Coating", as modified by these Special Provisions. <br /> 38 <br /> 39 All exposed surfaces of the new concrete catcher block shall also receive anti-graffiti coating. I <br /> 40 <br /> 41 Payment <br /> 42 Payment will be made for the following bid item when included in the proposal: <br /> 43 <br /> 44 "Cleaning and Anti-Graffiti Coating", lump sum. <br /> 45 <br /> 46 The lump sum contract price for "Cleaning and Anti-Graffiti Coating" shall be full pay for work <br /> 47 required to remove graffiti from existing surfaces and for all costs incurred by the Contractor <br /> 48 in complying with the requirements as specified in Section 9-08 to apply anti-graffiti coating. <br /> 49 The lumps sum contract price shall also be full pay for furnishing all equipment and materials <br /> I <br /> MAPLE HEIGHTS BRIDGE SEISMIC RETROFIT PAGE 82 OF 106 SPECIAL PROVISIONS—Addendum 1 <br /> WORK ORDER#3693 MAY 4,2020 FEDERAL AID#BHM-2776(008) <br />