Laserfiche WebLink
21.6 <br /> June 10,1992 �,-) <br /> CHANGE ORDER-SLUDGE REMOVAL <br /> Moved by Councilman Overstreet,seconded by Councilman Campbell <br /> to authorize the Mayor to sign Change Order No. 1 for the City <br /> of Everett 0losolids (sludge) removal, haul and utilization <br /> project contract. <br /> The original contract with Sani-Agri Services was for.4,000 dry <br /> tons to be reduced to 2,000 dry tons. Sani-Agri has agreed to <br /> hold the original Contract unit price. <br /> Roll was celled with allou ncilmen voting yes except <br /> Councilman Moser who was excusetl <br /> Motion carried. <br /> CHANGE ORDER-SOUTH END INTERCEPTOR EXTENSION <br /> NORTH 6 WEST SEGMENTS <br /> Moved by Councilman Campbell,seconded by Councilman Overstreet <br /> to accept Change Order No. 5 for the South End Interceptor <br /> Extension-North 6 West Segments, allowing the Mayor to sign <br /> this change order,in the amount of 55,570,738.07. /� <br /> Due to an <br /> increase in quantities to complete' the jab 0_/ <br /> designed s change order has been issued to the general <br /> contractor, i -State Construction. The change order includes <br /> installation of an <br /> tgravity sewer from Pump Station 15 intake <br /> manhole to Manhole W8. This gravity sewer will eliminate the <br /> expense of Pump Station No.16. <br /> Rollw councilmen called with all voting yes except <br /> Councilmen Moser who was excused <br /> Motion carried. <br /> JOB COMPLETE-FLUORIDATION SYSTEM FACILITY <br /> Moved by Councilman Diamond, seconded by Councilman Overstreet <br /> to accept the Fluoridation System Facility project as <br /> c omplete <br /> allowing the Mayor to sign the final contract voucher <br /> certification and start the 30 day retentionperiod prior to <br /> the release of the retainage to Pacific Crest Construction,the <br /> general contractor. <br /> Roll was called with allcou ncilmen voting yes except <br /> Councilman Moser who was excused <br /> Notion carried. 0 <br />