My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000/01/26 Council Minutes
>
Council Minutes
>
2000/01/26 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 3:04:43 PM
Creation date
9/29/2020 2:22:24 PM
Metadata
Fields
Template:
Council Minutes
Date
1/26/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 26,2000 <br /> annul cost of the maintenance activities;Section 5.2.2-Planning Director will <br /> determine how long the assurance device is in effect;Section 8.2.3-If <br /> maintenance t carried out then the Planning Director will notify <br /> Safeway;Section n9Cre <br /> -restricts delivery trucks from using d2n0 Street wen of <br /> parking lot entrance and Grand Avenue;Section 9.2-sign will be posted <br /> regarding restrictions on 42^Street and Grad Avenue;and Section 10- <br /> negotiatdon with the BP Station is encouraged. <br /> CouociMembera questioned how enforcement would be dealt with,and what <br /> Safeway's plans for the BP property would be and how long it would Its for <br /> the site to actually look like the she plans. <br /> Mr.Walsh indicated that BP did not wish to terminate Web']year lease.At <br /> this time Safeway does not have any plans for that property. <br /> Mr.Walsh then presented a computer simulation showing the consequences of <br /> locating the loading dock to the north.He explained that a substantial number <br /> of customers enter Safeway from the Ota Street entrance. The simulation <br /> depicted a semi cock backing into the lading dock and crossing the entrance <br /> traffic path.It took several tempts for the Irak 10 line up so as to back into <br /> the loading dock.It also depicted um backed up on 41'Street waiting to enter <br /> the 41°Street entrance.Safely is an issue for Safeway. <br /> Discussion ensued regarding whether the buffer and parking spaces in the arca <br /> of the BP could be removed in order to make more mom for the anti trucks to <br /> live up with the loading dock. <br /> John Man,4131 Grad Avenue.stated that truck deliveries from 5 a.m to 11 <br /> p.m.would intact their lifestyles and asked for more restrict hours.When <br /> asked he indicated that locating the loading dock to the north would be a better <br /> plan.He also stated that Section 9.1 deals only with Safeway cocks and needs <br /> to address all delivery trucks. <br /> Tia Waddell,1210 42m Street,stated that the increase in customer traffic has <br /> not been addressed and was concerned about the impacts on property value. <br /> When asked she also indicated that locating the loading dock to the north would <br /> bee better plan. <br /> 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.