Laserfiche WebLink
March 14.2008 • <br /> CONSENT ITEMS <br /> Moved by Council Member Gipson,seconded by Council Member <br /> Hatloe to approve the following consent item: <br /> RESOLUTION—CLAIMS <br /> To adopt Resolution No.5996 acknowledging the payment of audited <br /> and approved claims against the City of Everett in the amount of <br /> $1,497,484.24 for the period of February 23,2008 through February <br /> 29,2008. <br /> BID CALL <br /> To authorize a call for bids for the 2008 Pavement Marking project. <br /> STATEMENT OF QUALIFICATIONS <br /> To authorize the advertisement of a statement of qualifications for an <br /> engineering report on the Water Pollution Control Facility. <br /> JOB COMPLETE—CORBIN DRIVE PEDESTRIAN/CURB RAMP <br /> IMPROVEMENTS <br /> To accept the Corbin Drive Pedestrian and Curb Ramp improvement <br /> project as complete and authorize the Mayor to sign a certificate of <br /> completion which will begin the 80-day retention period prior to the <br /> release of retoinage In the amount of$11,812.06 to the general <br /> contractor,Precision Earthworks,Inc. <br /> Roll was <br /> called with all council members voting yes except Council <br /> MemberRoberts who was excused. <br /> Motion carried. <br /> 69 <br />