My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/03/14 Council Minutes
>
Council Minutes
>
2008/03/14 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 3:54:09 PM
Creation date
9/29/2020 4:46:44 PM
Metadata
Fields
Template:
Council Minutes
Date
3/14/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 14.2008 • <br /> CONSENT ITEMS <br /> Moved by Council Member Gipson,seconded by Council Member <br /> Hatloe to approve the following consent item: <br /> RESOLUTION—CLAIMS <br /> To adopt Resolution No.5996 acknowledging the payment of audited <br /> and approved claims against the City of Everett in the amount of <br /> $1,497,484.24 for the period of February 23,2008 through February <br /> 29,2008. <br /> BID CALL <br /> To authorize a call for bids for the 2008 Pavement Marking project. <br /> STATEMENT OF QUALIFICATIONS <br /> To authorize the advertisement of a statement of qualifications for an <br /> engineering report on the Water Pollution Control Facility. <br /> JOB COMPLETE—CORBIN DRIVE PEDESTRIAN/CURB RAMP <br /> IMPROVEMENTS <br /> To accept the Corbin Drive Pedestrian and Curb Ramp improvement <br /> project as complete and authorize the Mayor to sign a certificate of <br /> completion which will begin the 80-day retention period prior to the <br /> release of retoinage In the amount of$11,812.06 to the general <br /> contractor,Precision Earthworks,Inc. <br /> Roll was <br /> called with all council members voting yes except Council <br /> MemberRoberts who was excused. <br /> Motion carried. <br /> 69 <br />
The URL can be used to link to this page
Your browser does not support the video tag.