Laserfiche WebLink
January 4, 2019 <br /> SUBMITTAL REVIEW Greenberry—Specification Section 23 65 14.15 <br /> Boeing Bldg. 40-04 &40-41 Cooling Towers Replacement <br /> Sazan Project No. 543-1898 <br /> Proposal page Upper level railing X Provide Swing gate at <br /> 10 of 24 gap shown in upper <br /> level railing that swings <br /> in toward fan. <br /> Page 11 of 24 Lifting Davit X Verify that lifting Davit <br /> has height and reach to <br /> swing to clear the motor <br /> platform such that <br /> motor can be easily <br /> removed and lifted and <br /> lowered to lower <br /> platform <br /> Page 12 of 24 Oil and motor heater X EVAPCO to provide the <br /> thermostats thermostats that <br /> activate the motor and <br /> gearbox oil heaters <br /> wired to a single control <br /> panel for both cells on <br /> Face C or accessible <br /> from lower platform. <br /> Provide dual Gearbox <br /> and dual motor heaters <br /> missing from 120V <br /> wiring detail <br /> Page 13 of 24 Vibration and low X <br /> gearbox oil interrupt <br /> Relays <br /> Page 12 Fan Motor Space X Please indicate how <br /> Heaters motor heaters will be <br /> controlled <br /> Page 13 Vibration Switch X Drawing is not <br /> applicable for VFD <br /> applications. The <br /> controls circuit <br /> cannot be derived <br /> from the motor circuit <br /> as shown. <br /> VFD Submittal 100HP Pump Motor X Need to include VFDs <br /> VFDs for 100HP pump <br /> motors. <br /> Motor Motor Rating X Cannot confirm that <br /> Submittal the motors are <br /> inverter rated with <br /> shaft grounding rings. <br /> Page 2 <br />