Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> Plug existing connecting pipes that remain in accordance with 2-02.3(5) of <br /> these Special Provisions. Backfill shall be Gravel Borrow as specified in 9- <br /> 03.14(1). Compact backfill to a minimum of 95 percent maximum density in <br /> accordance with 2-03.3(14)D. <br /> 2-02.3(3)F Removal of existing pipe <br /> Where shown on the plans, excavate and remove the existing pipe as needed <br /> for installation of new improvements. <br /> Plug connections to structures and existing pipes that remain in accordance <br /> with 7-08.3(4) of these Special Provisions. Backfill shall be Gravel Borrow as <br /> specified in 9-03.14(1). Compact backfill to a minimum of 95 percent maximum <br /> density in accordance with 2-03.3(14)D. <br /> 2-02.3(4) Obliteration of Pavement Markings <br /> (******) <br /> Remove pavement markings where shown on the Plans or where designated by <br /> the Engineer. Obliterate pavement marking until blemishes caused by the <br /> pavement marking removal conform to the coloration of the adjacent pavement. If <br /> the pavement is materially damaged by pavement marking removal operation, <br /> Contractor shall repair the pavement damage, at the Contractor's expense, to a <br /> condition equal to existing pavement that had no markings obliterated. Remove <br /> sand or other material deposited on the pavement as a result of removing stripes <br /> and markings as the Work progresses to avoid hazardous conditions. <br /> Accumulation of sand or other material that might interfere with drainage will not <br /> be permitted. <br /> 2-02.3(5) Abandon Pipe In-place <br /> (******) <br /> Where designated on the plans, pipes to be abandoned shall be plugged in <br /> accordance with 7-08.3(4) of these Special Provisions. Where in conflict with new <br /> work, abandoned pipes shall be removed and disposed of as necessary to install <br /> the new work and the existing pipe remains shall be plugged. If designated on <br /> Plans, completely fill abandoned in-place pipe with Controlled Density Fill as <br /> specified in 2-09.3(1)E. <br /> 2-02.3(6) Sawing and Line Drilling <br /> (******) <br /> Saw-cut to full depth mortared decorative or special pavement including, but not <br /> limited to, brick, cobblestone or paver block along a neat line with intent of <br /> salvaging as many units as possible. <br /> When line drilling, drill holes at maximum center-to-center spacing of six-inches. <br /> Drill holes perpendicular to the surface and penetrate completely through the <br /> pavement. <br /> When the Plans indicate, or the Engineer requires, saw-cutting pavement that is <br /> comprised of a rigid base and asphalt overlay, saw cut the rigid base to the <br /> minimum depth as follows: <br /> a. For concrete rigid base, saw cut to a depth of 2/3 the thickness of the rigid <br /> base. <br /> b. For rigid base constructed with mortared decorative or special pavement <br /> including, but not limited to, brick, cobblestone, or paver block, or a <br /> combination of such materials saw cut to full depth of the rigid base along a <br /> neat line with intent to salvage as many special pavement units as possible. <br /> Jackson Park Area Stormwater Separation Division 2—EARTHWORK September 2020 <br /> WO No. -UP3703 SP—135 <br />