My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 12/7/2020
>
Contracts
>
Capital Contract
>
R L Alia Company 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 1:38:29 PM
Creation date
12/9/2020 12:33:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
12/7/2020
Council Approval Date
11/10/2020
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Jackson Park Area Stormwater
Public Works WO Number
UP3703
Tracking Number
0002555
Total Compensation
$12,326,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R.L. Alia Company 5/4/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> planing area. See Section 8-20 of the Specifications for details on loop <br /> installation and payment. <br /> Planing shall be performed in such a manner that the underlying pavement is <br /> not torn, broken, or otherwise damaged by the planing operation. The surface <br /> of the underlying pavement shall be slightly grooved or roughened sufficiently <br /> to ensure a bond when overlaid. All areas to be ground shall be completed <br /> with a grinder. The use of other methods must be approved by the Engineer. <br /> The planings shall become the property of the Contractor and shall be removed 3 <br /> from the right-of-way. The planings may be utilized as RAP, within the <br /> requirements of Section 5-04.2 or 9-03.21. The Contractor shall immediately <br /> dispose of all other debris resulting from the planing operation in a Contractor- <br /> provided site off the right-of-way. <br /> Immediately after grinding, the Contractor must construct an asphalt transition <br /> on all traveled ways and exposed manholes, inlets, catch basins, monuments, <br /> valve boxes, and other structures on the street, regardless of depth in grinding. <br /> Asphalt transition must be removed prior to overlay. Cast iron structures left <br /> higher than 1-1/2" must be removed and steel plates installed to protect the <br /> opening and provide a suitable driving surface. <br /> After grinding, sweeping of roadway surfaces shall be immediate and must be <br /> overlayed within 72 hours. Sweeping of roadway surface is required prior to <br /> tack placement and paving. <br /> Sweepers following the grinding work will not be paid separately, and is <br /> incidental to bid item "Planing Bituminous Pavement(0 to 6" Deep)", per square <br /> yard. <br /> For mainline planing operations, the equipment shall have automatic controls, <br /> with sensors for either or both sides of the equipment. The controls shall be <br /> capable of sensing the proper grade from an outside reference line, or a mat- <br /> referencing device. The automatic controls shall also be capable of <br /> maintaining the desired transverse slope. The transverse slope controller shall <br /> be capable of maintaining the mandrel at the desired slope (expressed as a <br /> percentage) within plus or minus 0.1 percent. <br /> 5-04.4 Measurement <br /> Delete all paragraphs of 5-04.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section <br /> 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 5-04.5 Payment <br /> Delete all paragraphs in 5-05.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> Jackson Park Area Stormwater Separation September 2020 <br /> WO No.—UP3703 Division 5—SURFACE TREATMENTS AND PAVEMENTS <br /> SP -148 <br />
The URL can be used to link to this page
Your browser does not support the video tag.