Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> planing area. See Section 8-20 of the Specifications for details on loop <br /> installation and payment. <br /> Planing shall be performed in such a manner that the underlying pavement is <br /> not torn, broken, or otherwise damaged by the planing operation. The surface <br /> of the underlying pavement shall be slightly grooved or roughened sufficiently <br /> to ensure a bond when overlaid. All areas to be ground shall be completed <br /> with a grinder. The use of other methods must be approved by the Engineer. <br /> The planings shall become the property of the Contractor and shall be removed 3 <br /> from the right-of-way. The planings may be utilized as RAP, within the <br /> requirements of Section 5-04.2 or 9-03.21. The Contractor shall immediately <br /> dispose of all other debris resulting from the planing operation in a Contractor- <br /> provided site off the right-of-way. <br /> Immediately after grinding, the Contractor must construct an asphalt transition <br /> on all traveled ways and exposed manholes, inlets, catch basins, monuments, <br /> valve boxes, and other structures on the street, regardless of depth in grinding. <br /> Asphalt transition must be removed prior to overlay. Cast iron structures left <br /> higher than 1-1/2" must be removed and steel plates installed to protect the <br /> opening and provide a suitable driving surface. <br /> After grinding, sweeping of roadway surfaces shall be immediate and must be <br /> overlayed within 72 hours. Sweeping of roadway surface is required prior to <br /> tack placement and paving. <br /> Sweepers following the grinding work will not be paid separately, and is <br /> incidental to bid item "Planing Bituminous Pavement(0 to 6" Deep)", per square <br /> yard. <br /> For mainline planing operations, the equipment shall have automatic controls, <br /> with sensors for either or both sides of the equipment. The controls shall be <br /> capable of sensing the proper grade from an outside reference line, or a mat- <br /> referencing device. The automatic controls shall also be capable of <br /> maintaining the desired transverse slope. The transverse slope controller shall <br /> be capable of maintaining the mandrel at the desired slope (expressed as a <br /> percentage) within plus or minus 0.1 percent. <br /> 5-04.4 Measurement <br /> Delete all paragraphs of 5-04.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section <br /> 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 5-04.5 Payment <br /> Delete all paragraphs in 5-05.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> Jackson Park Area Stormwater Separation September 2020 <br /> WO No.—UP3703 Division 5—SURFACE TREATMENTS AND PAVEMENTS <br /> SP -148 <br />