My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Timmons Group 12/4/2020
>
Contracts
>
6 Years Then Destroy
>
2025
>
Timmons Group 12/4/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2025 1:42:43 PM
Creation date
12/16/2020 12:26:53 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Timmons Group
Approval Date
12/4/2020
Council Approval Date
12/2/2020
End Date
12/31/2025
Department
Purchasing
Department Project Manager
Theresa Bauccio-Teschlog
Subject / Project Title
Computerized Maintenance & Asset Mgmt (CMAMS)
Tracking Number
0002581
Total Compensation
$639,925.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Timmons Group Inc 2/16/2025 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Other Procurement Agreements
Timmons Group Inc. 11/8/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
interfaces are developed, a rigorous testing plan will be executed. This scope includes time and cost <br /> associated with integrations via APIs. If it is determined that a less time intensive solution is identified this <br /> option and associated savings will be discussed with the City project manager prior to proceeding. Upon <br /> successful completion of this User Acceptance Testing (UAT), the interfaces are then ready for <br /> deployment. <br /> • Planning— Planning is comprised of a workshop(s)where the implementation team iteratively <br /> works through the reasons for the integration, what data needs to flow back and forth (or <br /> sometimes in one direction), and how best from a technical perspective of how to achieve this <br /> integration (developing requirements). The team then develops these requirements, using <br /> cases/stories and designs the necessary workflows that depict the transfer of data between <br /> systems. The workshop will typically result in the need to engage the target system vendor, either <br /> to procure items such as a database design/schema diagram up to and including engaging their <br /> assistance in designing and developing the integration itself. <br /> • The Build phase of the integration process is here the team develops sprints that are <br /> approximately 'I to 2 weeks in duration that iteratively reflect the use cases/stories and <br /> methodology developed during the previous Planning step. During sprint execution the team <br /> develops code and automated tests simultaneously using techniques such as Test-Driven <br /> Development(TDD), pair <br /> programming and continuous <br /> integration. Once the interfaces qua <br /> ,42 <br /> are developed, a testing plan will x� <br /> be executed. Upon successful <br /> completion of this User <br /> Acceptance Testing (UAT), the HI Requirements <br /> interfaces are ready for Review .Y i <br /> • Training—Our team then works <br /> with the appropriate <br /> User Acceptance <br /> stakeholders to train them both <br /> at the end user level and also to resting <br /> train one or more stakeholders <br /> • <br /> in how the integration was <br /> developed and the management <br /> requirements to keep the t <br /> � is <br /> integration working correctly. *:; . • � 2.4 <br /> • Production Deployment—After <br /> the integration has peens <br /> developed (and tested 4 gym'.; <br /> throughout the development)we <br /> move on to deploying the <br /> integration into the production <br /> environment. Timmons must <br /> provide production deployment cross-training and documentation to Information Technology staff. <br /> • Postproduction System Review—Once the integration is in production the team verifies that the <br /> integration was successful against the requirements defined during the Planning step. Any <br /> identified problems will be addressed and corrected. <br /> 25I Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.