Laserfiche WebLink
City of Everett <br /> Engineering and Environmental <br /> F L O Y D I SNIDER Consulting for Riverfront Project <br /> • Support to the City for the preparation, review, and coordination of the long-term <br /> operations and maintenance plan developed by the City and the landfill site <br /> developer's joint third-party landfill gas consultant, and the developer. <br /> • Project Management activities associated with grant-reimbursable activities. <br /> TASK 3— ENVIRONMENTAL MONITORING, MANAGEMENT SUPPORT,AND COORDINATION <br /> Task 3A: Environmental Monitoring and Reporting <br /> Floyd I Snider will conduct the following services to provide the environmental monitoring of the <br /> site as required by the CD. These tasks are not associated with specific permit review packages <br /> and are not Ecology grant-eligible: <br /> • File transfer from HWA. This assumes the City GIS department will lead figure <br /> development for reporting, with support and instruction from Floyd'Snider. This <br /> scope also assumes that no validation of historical data will be conducted and that <br /> data are compiled by HWA prior to transfer to Floyd I Snider and the City. <br /> • Groundwater protection monitoring as required by the CD, consisting of semiannual <br /> groundwater monitoring. <br /> • Laboratory coordination for analysis of groundwater samples including contracting, <br /> detection limit confirmation, and bottle orders. This estimate assumes the City's <br /> Environmental Laboratory will provide sample analyses for dissolved metals and <br /> dissolved chloride. All other analytes will be subcontracted to a licensed local <br /> laboratory. <br /> o Semiannual groundwater monitoring including sampling and water level <br /> measurements at nine monitoring wells. This work will be conducted in two <br /> 8-hour days including travel for two personnel. <br /> o Sample event preparation including field planning meetings, mobilization tasks, <br /> field documentation quality control (QC), work plan review, and health and safety <br /> plan development and implementation. This is assumed to include 5 hours per <br /> field staff, per event. <br /> o Data review, validation, and management including submittal to Ecology's <br /> Environmental Information Management system. <br /> o Preparation of annual monitoring reports including summary of results and limited <br /> interpretation of the data. <br /> o Responding to Ecology comments and questions on results including attending <br /> meetings. <br /> November 13,2020 Page 2 of 3 Scope of Work <br /> 3007 001 jf245212mx <br />