9. A fire hydrant is required within 200 driving feet but not closer than 50 feet of every structure. <br /> 10.A fire hydrant is required within 350 driving feet of every structure, The hydrant(s) must meet City <br /> specifications. <br /> 11. City streets and alleys are to be kept clear of dirt and debris at all times during construction. Dust <br /> suppression and street cleaning must occur as directed by the Public Works Inspector. <br /> 12.A one year warranty is required on the public improvement for an amount not less than 10% of the cost <br /> of construction and shall run for one year from the date of final approval/issuance of the first Occupancy <br /> Permit. <br /> 13.Lack of comment on the plans submitted with the application does not constitute approval of these plans. <br /> 14.A two year guarantee is required for private retention/detention or other drainage treatment/abatement <br /> facilities serving areas Iarger than one acre. <br /> 15.As-builts of storm sewer, sanitary sewer, and water systems will be required to be submitted per City <br /> Design and Construction Standards and Specifications for Development. <br /> 16.Any broken or damaged sidewalk shall be repaired/replaced per the City Public Works Inspector. <br /> 17.Walkways must be provided from the building entrance to the public sidewalk. <br /> 18.The construction plans must be designed from a site survey performed by a licensed State of Washington <br /> land surveyor. <br /> 19. Soil compaction testing shall be performed throughout the construction of the public street and utilities. <br /> Density curves shall be submitted to the Public Works Department prior to permits being issued for any <br /> aspect of the project. All work performed by the geotechnical engineer or testing lab shall be reported <br /> directly to the City Public Works Inspector before covering work can be continued by the contractor. <br /> Daily reports shall be kept by the soils investigator/tester and submitted to the Public Works Inspector <br /> within 24 hours. <br /> 20. All exposed ground must be reseeded within 30 days of the completion of construction. If reseeding is <br /> not practical due to weather or seasonal problems,the ground must be covered with mulch as directed by <br /> the City Engineer. <br /> 21.Temporary erosion control measures for construction activity must be operational prior to <br /> commencement of any clearing or earthwork. <br /> 22. The project will need to drain the detention vault by gravity rather than pump to discharge. <br /> 23. The sewer in the alley is in very bad condition. Rather than discharging to the existing pipes in the alley, <br /> extend from the project south about 150 feet south and discharge to the 12" sewer on the south side of <br /> 34th. Both sewer and storm drainage from the property would discharge to the new sewer extension. <br /> 24. Protect the 6"water main under the sidewalk during construction. Coordinate with the City of Everett <br /> water department during construction if the water main along Broadway it needs to be replaced or <br /> abandoned. <br /> 25. All site access driveways and parking areas shall comply fully with City of Everett standards.As <br /> currently shown the parking area with direct access from Broadway does not meet required throat depth, <br /> aisle width,and stall width dimensions. It also does not provide the required vehicle turnaround area. <br /> 05//� <br /> Final MD #17-006 <br />