My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mackenzie Engineering Inc. 12/7/2020
>
Contracts
>
6 Years Then Destroy
>
2021
>
Mackenzie Engineering Inc. 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 12:43:55 PM
Creation date
12/21/2020 12:42:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Mackenzie Engineering Inc.
Approval Date
12/7/2020
Council Approval Date
12/2/2020
End Date
12/31/2021
Department
Facilities
Department Project Manager
Chris Lark
Subject / Project Title
Design Services EMB PW Tenant Improvement
Tracking Number
0002598
Total Compensation
$325,700.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
facilitate the meeting, which will explore the qualitative goals, messaging, challenges and <br /> opportunities anticipated during the project.The following will attend:Mackenzie,BCE, and <br /> Roen.Meetingminutesforthis meeting will be prepared by Mackenzie. <br /> 3. Meetings:Throughout this phase, Mackenzie will coordinate and attend the below outlined <br /> meetings with the Core Team, mayor and City Council through concept design for Schematic <br /> Design.At each Core Team meeting,we will review the overall progress of the design and <br /> other action items, including milestone reviews of the design progress as it is developed. <br /> Mackenzie will prepare meeting minutes for these meetings. Design disciplines will be in <br /> attendance as indicated within each meeting below. <br /> 4. Schedule:Update the preliminary project schedule from Schematic Design through project <br /> completion.The schedule will be coordinated with the City. <br /> 5. Concept Design:Develop initial conceptual design options that begin to describe the scale <br /> and relationship of project components and begin to articulate the approved program,goals, <br /> and projectvision established during the Pre-Design phase.Initial conceptual design options <br /> will be developed for initial Core Team review prior to City Council presentation.Final concept <br /> design approval of a single preferred design option will be advanced through Schematic <br /> Design with ongoing input from the cost estimator. The following will be developed during <br /> Concept Design: <br /> A. Adjacency Diagram Concepts: <br /> I. Up to three (3) adjacency diagram options will be developed,utilizing the <br /> approach of low impact, moderate impact and high impact to the existing <br /> conditions. <br /> II. Spatial needs assessment will lay out a cross functional floor plan thatserves <br /> primary building components.These relationships will consider both internal <br /> building adjacencies as well as inter-building relationships and connections <br /> across the site. <br /> B. Test Fits Concepts: <br /> I, Up to two (2) conceptual floor plan options will he developed based on a <br /> single approved adjacency diagram. <br /> C. Mechanical,Electrical, Plumbing, Fire Protection <br /> I. Refer to attached BCE Engineers proposalfor detailed scope of work. <br /> D. Visioning Boards: <br /> E. Up to four(4)conceptual visioning I interior precedent image boards will be prepared <br /> for Client. These will be prepared to indicate initial design direction and overall <br /> direction and aesthetics for the interior finish materials and inform the interior <br /> material selections to be prepared in Phase 2. <br /> 6. Meeting—Core Team: Conduct a Core Team meeting at Client's office to review conceptual <br /> design progress,and to review the preliminary adjacency plan designs.This meeting will also <br /> serve as a building systems meeting,including BCE Engineering,where mechanical,plumbing <br /> and electrical systems will be discussed, and preliminary systems selected for the project. <br /> Based on Core Team feedback, Mackenzie will make refinements and prepare the draft <br /> schematic design report for issuance to Client for review prior to pricing. Design team <br /> attendance will include Mackenzie,BCE,and Roen. <br /> Page 6 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.