My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mackenzie Engineering Inc. 12/7/2020
>
Contracts
>
6 Years Then Destroy
>
2021
>
Mackenzie Engineering Inc. 12/7/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 12:43:55 PM
Creation date
12/21/2020 12:42:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Mackenzie Engineering Inc.
Approval Date
12/7/2020
Council Approval Date
12/2/2020
End Date
12/31/2021
Department
Facilities
Department Project Manager
Chris Lark
Subject / Project Title
Design Services EMB PW Tenant Improvement
Tracking Number
0002598
Total Compensation
$325,700.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 3: Review project TI scope and develop recommended design criteria for exterior noise <br /> intrusion,reverberation, sound isolation, HVAC background noise, and property line noise <br /> limits forgeneratorsetand exterior mechanical equipment. <br /> Task 4. Prepare a pre-design narrative documenting ourwork and recommendations. <br /> Prepare the following deliverables: <br /> • Draft and Final Narrative <br /> • Drawing markups(as needed) <br /> Schematic Design <br /> Task 5: Attend up to three teleconferences coordinating acoustical aspects of the project. <br /> Task 6: Review floor plans and provide general recommendationsfor wall types and surface fin ishes <br /> based on space type and adjacencies. <br /> Task 7. Prepare a schematic design narrative outlining acoustical performance requirements for <br /> sound isolation between spaces,reverberation control, sound masking systems for open <br /> office spaces,background sound levels from the mechanical system,and offsite noise limits. <br /> Prepare the following deliverables: <br /> • Draft and Final Narrative <br /> • Drawing markups(as needed) <br /> SCOPE OF SERVICES-MACKENZIE <br /> FF&E Procurement and Construction Management Services <br /> (Furniture Selection services to be provided during Phase II —Design Development and Bidding Phase). <br /> Services to include the following: <br /> 1. Schematic Design <br /> A. Meetwith Client to reconfirm furniture needs and design requirements. <br /> B. Inventory of any existing furniture to be re-used (including inventory of US Forest <br /> Service furniture). <br /> 2. Design Development <br /> A. Provide preliminary furniture plan to Client for review, including options for <br /> workstation layouts and standardizing furniture layouts, materials and finishes <br /> throughoutthe facility. <br /> B. Provide two (2) revisions to preliminary furniture plan incorporating Client <br /> comments. <br /> 3. Assumptions <br /> A. Furniture delivery method to be determined. <br /> Page 11 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.