Laserfiche WebLink
1 <br /> • When the plastic is no longer needed, it shall be completely removed. I <br /> • If tires are used to weight down the plastic sheeting,they must be disposed of properly. <br /> Inlet Protection <br /> • Catch basin filter inserts shall be inspected frequently, especially after storm events. If the <br /> filter becomes clogged, it should be cleaned or replaced. <br /> • Inserts shall be replaced when tears are detected. <br /> Silt Fence <br /> • Any damage shall be repaired immediately. I <br /> • If concentrated flows are evident uphill of the fence, they must be intercepted and <br /> conveyed to a sediment pond. I <br /> • Check the uphill side of the fence for signs of the fence clogging and acting as a barrier to <br /> flow and causing channelization of flows parallel to the fence. If this occurs, replace the <br /> fence or remove the trapped sediment. I <br /> • Sediment deposits shall be removed when the deposit reaches approximately one-third the <br /> height of the silt fence, or a second silt fence shall be installed. <br /> • If the filter fabric(geotextile) has deteriorated due to ultraviolet breakdown, it shall be <br /> replaced. <br /> The maintenance inspection report will be made after each inspection. Copies of the report forms <br /> to be completed by the CSWPPP coordinator are attached as Exhibit 1 of this CSWPPP. <br /> Completed forms will be provided to the City Inspector and will also be maintained onsite during <br /> the entire construction project. If construction activities or design modifications are made to the <br /> site plan that could impact stormwater, or if AHBL determines that the measures are not <br /> adequate to prevent erosion and the discharge of sediment from the site (based on turbidity <br /> measurements), this CSWPPP will be amended appropriately. The amended CSWPPP will have <br /> a description of the new activities that contribute to the increased pollutant loading and the <br /> planned source control activities. <br /> 8.12 Manage the Project 1 <br /> The following practices will be required during construction to properly manage activities: <br /> • Comply with seasonal work limitations. <br /> • Inspect, maintain, and repair BMPs. 1 <br /> • Identify a Certified Erosion and Sediment Control Lead (CESCL). <br /> • Maintain the CSWPPP onsite at all times, including narrative and plans. I <br /> Construction Stormwater Pollution Prevention Plan <br /> The Bethany at Silver Lake 8 0111011 <br /> 2180406.10 <br />