My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1321 COLBY AVE 3RD FLOOR 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
1321
>
3RD FLOOR
>
1321 COLBY AVE 3RD FLOOR 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2021 8:23:14 AM
Creation date
1/14/2021 3:05:12 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
1321
Tenant Name
3RD FLOOR
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> PUBLIC WORKS <br /> July 17,2002 <br /> David Wachob <br /> Providence Everett Medical Center <br /> 1321 Colby Avenue <br /> Everett,WA 98201 <br /> Project: Colby Campus Backfill <br /> Job Address: 1321 Colby Ave <br /> Plan Review No: B0206-022 <br /> Dear Mr. Wachob: <br /> In response to your application for a construction permit, your plans have been examined and <br /> you are advised that the issuance of a permit is being withheld for the reasons listed below. <br /> These comments address building issues only. Additional revisions or additions may be <br /> required by other departments (such as Utilities, Planning or Fire). All references refer to the <br /> 1997 Uniform Building code, as amended by the State of Washington and/or the Washington <br /> State Energy Code, 1997 edition, unless noted otherwise. <br /> This review does not cover submitted mechanical, sprinkler,electrical or plumbing documents <br /> —these permits must be obtained separately and may require further review and submission of <br /> plans. <br /> In order for the processing of your application to continue, it will be necessary to <br /> provide the Building Division with two complete new sets of drawings reflecting the <br /> corrections requested. <br /> General <br /> 1) The architectural plans must be stamped and sealed by the registered architect. RCW <br /> 18.43.070 <br /> 2) The Washington State Department of Health performs additional plan reviews (concurrent <br /> and separate)of hospitals. Please contact them at (360)705-6782 for further information. <br /> 3) Electrical plan review will be done by a City of Everett Electrical Inspector. Please <br /> contact Tim Alaniz at(425) 257-8810 for further information. <br /> CITY OF EVERETT•3200 Cedar Street • Everett. WA 98201 • (425)257-8800• Fax(425)257-8856 <br />
The URL can be used to link to this page
Your browser does not support the video tag.