Laserfiche WebLink
1 <br /> l PUBL IC WORKS" <br /> August 19,2002 <br /> David Wachob <br /> Providence Everett Medical Center <br /> 1321 Colby Avenue <br /> Everett, WA 98201 <br /> Project: Colby Campus Backfill <br /> Job Address: 1321 Colby Avenue <br /> Plan Review No: B0206-022 <br /> Dear Mr. Wachob: <br /> Further clarification is required for the following items based on the original review letter <br /> dated July 17, 2002 and the reply received on August 8, 2002. Those items not addressed <br /> below have been satisfied. The numbering is per the original comment letter. Any new issues <br /> are stated in capitol letters at the beginning of each section. All references refer to the 1997 <br /> Uniform Building code, as amended by the State of Washington and/or the Washington State <br /> Energy Codc, 1997 edition, unless noted otherwise. <br /> In order for the processing of your application to continue, it will be necessary to <br /> provide the Building Division with two complete new sets of drawings reflecting the <br /> corrections requested. <br /> Construction <br /> 4. The flame-spread coating requirements for the Fibrwrap should be noted on the plans. <br /> ICBO ES Report 5282 <br /> Accessibility <br /> 2. The transfer showers in rooms C326, B352 & B353 should have the following revisions: <br /> a. The folding seat should be shown on the wall opposite that it is currently shown in <br /> order to provide the clear floor space as required in Section 1106.11.10.2. As this is a <br /> half-height wall, it may need to be raised to a full-height wall for bracing <br /> requirements. <br /> h. The shower controls should be shown on the wall opposite of the scat (where the scat <br /> is shown currently. Section 1 106.1 1.10.3 <br /> II.71W(Mp1 CON322 R I <br /> CITY OF EVERETT•3200 Cedar Street•Everett. WA 98201 •(425)257-8800•Fax(425)25Y-8856 <br />