My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1321 COLBY AVE 3RD FLOOR 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
1321
>
3RD FLOOR
>
1321 COLBY AVE 3RD FLOOR 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2021 8:23:14 AM
Creation date
1/14/2021 3:05:12 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
1321
Tenant Name
3RD FLOOR
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Architecture I Planning I Interior Design <br /> ZIMMERGUNSULFRASCA PARTNERSHIP <br /> 1191 S\:rund Avenue Suite 800 Seattle,WA 98101-2949 <br /> 2(16/623.9414 Fax:206/623-7868 <br /> September 4,2002 <br /> DECE6VE -) <br /> Tony R.Lee <br /> Plans Examiner SEP 0 5 2002 J <br /> City of Everett Public Works <br /> 3200 Cedar Street CITY OF EVERETT <br /> Everett,WA 98201 <br /> Permit Services <br /> RE: Plan Review No.130206-022 <br /> Colby Campus Backfill <br /> 1321 Colby Avenue <br /> Everett,WA <br /> Dear Tony, <br /> We have received your August 19,2002 comments and have found them to be very thorough and <br /> fair. Again,we would like to thank you for your patience. <br /> At this time we would like to request that the contact person listed on the application for permit <br /> be changed from David Wachob to Russ Brown,Zimmer Gunsul Frasca Partnership,(206)521- <br /> 3502. <br /> Attached are two full size sets of modified architectural drawings reflecting the comments <br /> discussed below. Also included are updated mechanical and electrical drawings. See the <br /> attached Release 3 document for the complete list of drawings included herein. <br /> The following is our response to your comments. Please feel free to call me with any questions or <br /> concerns,or if there is any other information that you might need. <br /> Our response is categorized and numbered to match your review comments. <br /> Construction: <br /> 4. Flame spread requirements typically only pertain to exposed items and finishes. The <br /> fiber-wrap product will be installed behind a gypsum wallboard thermal barrier and will <br /> not be an exposed finish in the building. Regardless we have added the flame-spread <br /> requirements to detail 4/A8.02. We have also attached a copy of the ICBO 5282 report for <br /> this product. See paragraph 2.4.3.2 Flame-spread Coating. Sec attached sheet A8.02 <br /> .ALwhr..lvn.an MMJd.V A A!,Maim r. <br /> rwrr. R.a.r..l ru..arAtA (].xorv%l.lJwn,FAlA Urrll lluMglAlA <br /> Rohr/II.Pr'.rJ III AWn1rf MA I S Munn rAIA R P+.A6d.r IAIA <br /> I..n I Rush..,MIA A..1 R 4wsm.aeryl AIA Marr.s.r% !SRA,Al', <br /> I.,I A I IFn..n AIA <br /> r..n re. A...,.%l(.nw.,l Al A r.ln1 A Coulon MA WJlu,n 1 l.rsrra AIA bn.l N'Nesl AIA <br /> M„hrlS Omura MA AIlvn'a.11mr1..AIA T.JJ A<.n.r AIA <br /> Pnrl/mr,l Seattle lax Angeles Washington DC <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.