My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Berk Consulting Inc. 1/5/2021
>
Contracts
>
6 Years Then Destroy
>
2022
>
Berk Consulting Inc. 1/5/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2021 1:06:49 PM
Creation date
1/20/2021 12:56:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Berk Consulting Inc.
Approval Date
1/5/2021
Council Approval Date
12/16/2020
End Date
12/31/2022
Department
Purchasing
Department Project Manager
Theresa Bauccio-Teschlog
Subject / Project Title
Park, Recreation, and Open Space Plan
Tracking Number
0002734
Total Compensation
$245,830.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO BE COMPLETED BY APPLICANT EVALUATION FOR <br /> AGENCY USE ONLY <br /> obstructions. <br /> 12) Location of the proposal. Give sufficient information for a person to understand the <br /> precise location of your proposed project,including a street address,if any,and section, <br /> township, and range, if known. If a proposal would occur over a range of area,provide <br /> the range or boundaries of the site(s).Provide a legal description,site plan,vicinity map, <br /> and topographic map, if reasonably available. While you should submit any plans <br /> required by the agency, you are not required to duplicate maps or detailed plans <br /> submitted with any permit applications related to this checklist. <br /> The South Everett Forest Preserve is located northwest of Silver Lake in Everett, <br /> Snohomish County,Washington.This 3.57-acre property is located in Section 19, <br /> Township 28N, Range 05E, (W.M.), between I-5 to the east and 77th Avenue SE to <br /> the west.The project site is an undeveloped lot owned by the City of Everett, <br /> Snohomish County parcel number 28051900400900. A vicinity map is provided in <br /> the Master Plan. <br /> B. environmental elements <br /> 1) Earth <br /> a. General description of the site(circle one): Flat, rolling,hilly,steep slopes, mountainous, <br /> other. <br /> b. What is the steepest slope on the site(approximate percent slope)? <br /> The topography of the site is rolling with some flatter areas. Slopes include small <br /> hills and depressions and the steepest slope is approximately 8%. <br /> c. What general types of soils are found on the site(for example, clay,sand,gravel,peat, <br /> muck)? If you know the classification of agricultural soils, specify them and note any <br /> prime farmland. <br /> Soils mapped by the US Department of Agriculture, Natural Resource Conservation <br /> Service(NRCS) indicate the property is covered with Alderwood-Urban land <br /> complex.This soil type is comprised of 60%Alderwood gravelly sandy loam and <br /> 25%urban land, neither of which is considered a hydric(wetland)soil by the NRCS. <br /> d.Are there surface indications or history of unstable soils in the immediate vicinity?If so, <br /> describe. <br /> No. <br /> e.Describe the purpose,type, and approximate quantities of any filling or grading <br /> proposed. <br /> Indicate source of fill. <br /> A very minor amount of localized excavation will be is necessary to provide grading <br /> at the trailhead and along some areas the trail alignments to create a more <br /> uniform trail profile and for ADA access.Overall,a total cut and fill volume is <br /> City of Everett Parks and Recreation:South Everett Forest Preserve Page 5 <br /> SEPA Checklist June 19,2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.