My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Berk Consulting Inc. 1/5/2021
>
Contracts
>
6 Years Then Destroy
>
2022
>
Berk Consulting Inc. 1/5/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2021 1:06:49 PM
Creation date
1/20/2021 12:56:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Berk Consulting Inc.
Approval Date
1/5/2021
Council Approval Date
12/16/2020
End Date
12/31/2022
Department
Purchasing
Department Project Manager
Theresa Bauccio-Teschlog
Subject / Project Title
Park, Recreation, and Open Space Plan
Tracking Number
0002734
Total Compensation
$245,830.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO BE COMPLETED BY APPLICANT EVALUATION FOR <br /> AGENCY USE ONLY <br /> estimated not to exceed 500 cubic yards. <br /> f. Could erosion occur as a result of clearing,construction,or use?If so,generally describe. <br /> Erosion is possible with any construction project; however, best management <br /> practices (BMPs)will be employed to prevent erosion and the trail construction <br /> activities will be focused and localized to occur only in specific areas of the site and <br /> all other areas of the site will be protected from disturbance. <br /> g.About what percent of the site will be covered with impervious surfaces after project <br /> construction(for example, asphalt or buildings)? <br /> Approximately 1,000 square feet of the 3.57-acre property will be impervious <br /> surface to allow for concrete pavement and a roofed kiosk to create a trailhead <br /> transition and ADA access to existing sidewalks at the end of 1O9th St SE.This <br /> equates to less than one percent of the site area. <br /> h.Proposed measures to reduce or control erosion,or other impacts to the earth,if any: <br /> Standard best management practices(BMPs)will be employed to prevent erosion. <br /> 2)Air <br /> a. What types of emissions to the air would result from the proposal (e.g., dust,automobile, <br /> odors,industrial wood smoke, etc.)during construction and when the project is <br /> completed? If any,generally describe and give approximate quantities if known. <br /> Some emissions from small construction equipment would be present during <br /> construction. Following project completion, no emissions would be generated. <br /> b. Are there any off-site sources of emissions or odor that may affect your proposal?If so, <br /> generally describe. <br /> No. <br /> c. Proposed measures to reduce or control emissions or other impacts to air,if any: <br /> None needed. <br /> 3)Water <br /> a. Surface: <br /> 1) Is there any surface water body on or in the immediate vicinity of the site(including <br /> year-round and seasonal streams, saltwater, lakes,ponds,wetlands)?If yes,describe <br /> type <br /> and provide names. If appropriate, state what stream or river it flows into. <br /> Surface water at the site includes seasonal ponding within a forested wetland <br /> and Silver Lake Creek which occurs along the east side the site. A tributary of <br /> Silver Lake and North Creek (Silver Lake Creek) flows from north to south <br /> City of Everett Parks and Recreation:South Everett Forest Preserve Page 6 <br /> SEPA Checklist June 19,2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.