My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Berk Consulting Inc. 1/5/2021
>
Contracts
>
6 Years Then Destroy
>
2022
>
Berk Consulting Inc. 1/5/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2021 1:06:49 PM
Creation date
1/20/2021 12:56:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Berk Consulting Inc.
Approval Date
1/5/2021
Council Approval Date
12/16/2020
End Date
12/31/2022
Department
Purchasing
Department Project Manager
Theresa Bauccio-Teschlog
Subject / Project Title
Park, Recreation, and Open Space Plan
Tracking Number
0002734
Total Compensation
$245,830.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
43.21C.030(2)(c). This determination assumes compliance with State law and City ordinances related <br /> to general environmental protection including but not limited to right-of-way improvement <br /> requirements, drainage, etc. This decision was made after review of a completed environmental <br /> checklist and other information on file with the lead agency. This information is available to the <br /> public on request. This Mitigated Determination of Non-Significance is specifically conditioned on <br /> compliance with the conditions attached hereto which are incorporated by reference as if fully set forth <br /> herein. <br /> This Final MDNS is issued under WAC 197-11-350. A 14-day public comment period for this <br /> proposal has been completed. <br /> Responsible <br /> Official: Allan Giffen, Director Phone: (425)257-8731 <br /> Title: Planning and Community Development Director <br /> Address: 2930 Wetmore Avenue, Suite 8-A, Everett, WA 98201 <br /> Date: September 1 015 <br /> lit <br /> <42:1 <br /> Signature: <br /> You may appeal this determination by filing an appeal on forms provided by the Planning Department <br /> and a fee to the Planning and Community Development Permit Services Counter at 3200 Cedar Street, <br /> 2nd Floor. The appeal period ends on September 15,2015. <br /> Contact Steve Ingalsbe to read or ask about the procedures for SEPA appeals. <br /> Notes: <br /> 1. A MDNS may be withdrawn in the event of significant changes in the proposal, disclosure of new <br /> significant information, misrepresentation by the applicant, or failure to comply with the <br /> conditions upon which this Mitigated Determination of Non-Significance is predicated. <br /> 2. This land use permit shall terminate if applicant does not apply for a building permit within 18 <br /> months (or, with an extension, 24 months), except where a time limit on the land use permit is <br /> otherwise established under federal or state law, city ordinance, or an executed development <br /> agreement. <br /> 3. The issuance of this Determination of Non-Significance does not constitute project approval. The <br /> applicant must comply with all applicable requirements of Everett's Municipal Code (EMC) prior <br /> to receiving any permits. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.