My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Berk Consulting Inc. 1/5/2021
>
Contracts
>
6 Years Then Destroy
>
2022
>
Berk Consulting Inc. 1/5/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2021 1:06:49 PM
Creation date
1/20/2021 12:56:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Berk Consulting Inc.
Approval Date
1/5/2021
Council Approval Date
12/16/2020
End Date
12/31/2022
Department
Purchasing
Department Project Manager
Theresa Bauccio-Teschlog
Subject / Project Title
Park, Recreation, and Open Space Plan
Tracking Number
0002734
Total Compensation
$245,830.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Watershed Company• EAlBlumen <br /> June 2012 <br /> amenity adjacent to the Interurban Trail. However,the Interurban Trail is <br /> designed as a regional pedestrian and bicycle trail and potential increased usage <br /> by the proposed park users is not anticipated to result in a significant impact to <br /> pedestrian and bicycle travel patterns in the area. <br /> 4.12.3 Mitigation Measures <br /> The Proposed Action would not result in any impacts associated with <br /> transportation or travel patterns, and thus mitigation measures would not be <br /> necessary. <br /> 4.13 Cumulative and Secondary Impacts <br /> The proposed action will not cause any adverse impacts to either the <br /> Conversion Site or Replacement Site areas that would contribute to any <br /> cumulative or indirect impacts. <br /> 5 PUBLIC PARTICIPATION <br /> As required by NEPA, the City of Everett published a notice of the Proposed <br /> Action and the availability of this Environmental Assessment,advertising a 30- <br /> day comment period. The notice was also distributed to: <br /> • U.S. EPA Region 10 <br /> • U.S.Fish and Wildlife Service <br /> • U.S. NOAA Fisheries <br /> • U.S.Army Corps of Engineers <br /> The date of availability is June 27,2012,and the comment period closes on July <br /> 26,2012. Comments can be mailed to Paul Kaftanski,Parks and Recreation <br /> Director,City of Everett,802 E.Mukilteo Boulevard, Everett,Washington 98203 <br /> or e-mailed to PKaftanski@ci.everett.wa.us. <br /> This Environmental Assessment is available for review at the following locations: <br /> - City Web Site (under Parks http://www.ci.everett.wa.us/default.aspx?ID=11) <br /> - City of Everett Planning and Community Development,8th floor,2930 <br /> Wetmore Avenue,Suite 8-A, Everett,Wa.98201 <br /> - City of Everett Parks and Recreation,Administration Building(#100),802 E. <br /> Mukilteo Boulevard, Everett,Wa. 98203 <br /> - City of Everett Libraries <br /> 1) Main library address is 2702 Hoyt Avenue, Everett,Wa. 98201 <br /> 2) Evergreen branch address is 9512 Evergreen Way,Everett,Wa. 98204 <br /> Page 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.