Laserfiche WebLink
• <br /> L• <br /> K E/NFEL DER <br /> • Bright People.Right Solution. <br /> • <br /> asphalt areas with PASER ratings of 6, pavement distress generally consisted of widely spaced <br /> • longitudinal and transverse cracks, and slight raveling. In PCC areas with PASER ratings of 8, <br /> • pavement distress generally consisted of minor surface defects with slight scaling, some open <br /> • joints, and isolated meandering cracks. <br /> • <br /> • 2.2.2 Existing Pavement Thicknesses <br /> • <br /> • The existing pavement thickness was measured in the borings. Asphalt pavement was either <br /> • observed to overlie aggregate base material or what appeared to be Cement Treated Base <br /> • (CTB). Approximate asphalt concrete and aggregate base course thicknesses (measured to the <br /> • nearest '/2 inch) are summarized in Table 1. <br /> • <br /> • Table 1 <br /> Existing Pavement Section Thicknesses <br /> • <br /> • Approximate Approximate <br /> • Location Asphalt Concrete Aggregate Base <br /> • Thickness (inches) Thickness (inches) <br /> KLF-1 3 19* <br /> • <br /> KLF-2 4 15* <br /> • <br /> • KLF-3 3 13* <br /> • KLF-4 3 9 <br /> • KLF-5 4 8 <br /> • KLF-6 4 5 <br /> • KLF-7 3 15* <br /> • *Base material observations indicate CTB material used in lieu of Aggregate Base. <br /> • <br /> • 2.3 SUBSURFACE CONDITIONS <br /> • <br /> • The near-surface soils encountered in the borings are predominantly silty sand fill soils with <br /> • variable gravel content and are similar in composition to the underlying native till soils. Existing <br /> • fill ranged in thickness from approximately 5' to 7' feet below the existing ground surface <br /> • (bgs) in the parking and drive through area on the west of the warehouse, and from 5 to 9 feet <br /> • bgs in the truck parking and loading area east of the warehouse. Based on available historical <br /> • satellite imagery, significant excavation and grading has taken place at the site in the past. <br /> • Greater fill depths than those observed at the boring locations should be anticipated at the site. <br /> • <br /> • <br /> • 20203884.001A/SEA20R110164 Page 7 of 28 June 1, 2020 <br /> ©2020 Kleinfelder <br /> • <br /> • <br />