• <br /> • S <br /> Mr. Mcllvain <br /> CRM Architects& Planners, Inc. <br /> Plan Check Number: B1805-010, First Review <br /> August 1, 2018 <br /> a. The anchorage uplift forces on Sheet S1.0 should be identified as ASD values. <br /> b. The calculations were performed considering Hilti HAS-E rods. These should be specified in <br /> General Note 1 with the epoxy system. <br /> 29.The shear wall shear connection design is based on a factored load of 2 kips per connection. <br /> Per NDS-15 Table 12E and adjustment factors per Table 11.3.1, maximum capacity is only 1.4 <br /> kips. Note that this capacity is for DFL; other grades will have less capacity. This capacity <br /> does not include the Group Action or Geometry factors (i.e., Cg and Cs). The design should be <br /> revised. See IBC Sections 1604.2 and 2307.1. See structural response letter <br /> 30.The shear wall shear connection design should be performed for the earthquake loading. The <br /> earthquake load shall be increased per the provisions of ACI 318-14 Section 17.2.3.5.3. In <br /> addition, the anchorage utilizies post-installed anchors and shall satisfy the provisions of <br /> Section 17.2.3.3. Revised calculations substantiating the shear connection design should be <br /> submitted for review. See IBC Sections 1604.10 and 1901.2. See structural response letter <br /> 31. Revised calculations for the design of the diaphragm shall be submitted for review. The <br /> diaphragm capacity shall be determined for each principal direction based on the configuration <br /> of the sheathing; see the case diagrams in AWC SDPWS-15 Table 4.2A. Collectors shall be <br /> provided as needed where the diaphragm capacities and connection lengths to the shear walls <br /> are not sufficient to provide direct load transfer. See IBC Sections 1604.1, 1604.4, and 2306.1. <br /> See structural response letter <br /> 32.The trusses bear on wide flange beams along Grid B per Plan 1/S3.0 and Detail 2/S3.0. The <br /> trusses should be provided with a positive horizontal connection to the beam. Alternatively, <br /> crossties may be provided interconnecting the truss top chords. The connections shall provide <br /> a minimum capacity of 5% of the truss dead and live load reaction at the support. Note that <br /> the Simpson H2.5A connections provide uplift resistance only and are not suitable to meet this <br /> requirement. See IBC Section 1613.1 and ASCE 7-10 Section 12.1.4. See structural response <br /> letter <br /> 33. Detail 3/S3.0 appears to show the intersection of the roof trusses and exterior walls. See IBC <br /> Sections 1603.1, 1604.1, 1604.4, 1609.1, and 1613.1. The following comments should be <br /> addressed: See structural response letter <br /> a. Horizontal connections to resist out-of-plane loading shall be provided. Note that the <br /> Simpson H2.5A connections provide uplift resistance only and are not suitable to meet this <br /> requirement. <br /> b. Calculations substantiating the connections for out-of-plane loading, including but not <br /> limited to wind leeward pressures, shall be submitted for review. The connections shall <br /> also provide a minimum capacity of 5% of the truss dead and live load reaction at the <br /> support per ASCE 7-10 12.1.4. <br /> c. Plan 1/S3.0 shall be provided with references to Detail 3/S3.0. <br /> 34. Detail 4/S3.0 appears to show the intersection of the roof deck with the exterior walls on Grids <br /> 1 and 4. See IBC Sections 1603.1, 1604.1, 1604.4, and 1609.1. The following comments <br /> should be addressed: See structural response letter <br /> Page 10 of1O; <br /> CITY OF EVERETT• 3200 Cedar Street • Everett, WA 98201 • (425) 257-8810 • Fax(425) 2 - 3-- <br />