My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8417 EVERGREEN WAY 2022-05-23
>
Address Records
>
EVERGREEN WAY
>
8417
>
8417 EVERGREEN WAY 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 7:28:37 AM
Creation date
1/28/2021 9:01:05 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8417
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ! <br /> Drew Martin <br /> From: Drew Martin <br /> Sent: Wednesday, May 22, 2019 11:35 AM <br /> To: 'Mark Mcllvain' <br /> Subject: RE: City of Everett Permit Services: 8417 Evergreen Way (B1805-010) - Third Review <br /> Attachments: Slab Insulation jpg; 20190522114147834.pdf <br /> Mark, <br /> The proposed detail does not appear structurally adequate.The stem walls for the walls above should be connected to <br /> the foundations. In addition,the anchor bolts do not appear to have adequate clear cover. <br /> See the attached mark-up showing the intent of the WSEC-15 Section C402.2.6, and the attached figure showing <br /> variations of the requirements. Either Alternative 1 or 2 is acceptable,though Alternative 2 may be necessary if the <br /> foundations are not 2' deep below the slab for the entire building perimeter. For Alternative 2,the 24" dimension must <br /> be maintained; it is not reduced for the vertical leg providing the thermal break.The thermal break construction may be <br /> beveled at the top if preferred, but shall extend to the top surface. <br /> Lastly,the detail shall specify a minimum thermal rating of R=10 for the insulation. <br /> Drew Martin, P.E.,S.E. <br /> LIImo Associate Engineer—Commercial Plans Examiner I Permit Services <br /> 425.257.8813 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> EVERETT Hours: Monday—Friday 7:30am-12:00pm and 1:O0pm-4:00pm <br /> everettwa.gov I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> From: Mark Mcllvain<markm@crmarchitects.com> <br /> Sent:Wednesday, May 22, 2019 10:54 AM <br /> To: Drew Martin<dmartin@everettwa.gov> <br /> Cc:Jonathan Martin<jonm@martinconsultinggroup.biz> <br /> Subject: RE: City of Everett Permit Services: 8417 Evergreen Way(B1805-010)-Third Review <br /> Good morning Drew, will detail#10 be sufficient on the thermal break requirement? <br /> inamo <br /> CR MArchileets & Planners Inc, <br /> is <br /> Mark Mcllvain <br /> Principal/Project Manager <br /> Carissimi Rohrer McMullen Architects&Planners \ <br /> 5800 Stanford Ranch Road#720 <br /> Rocklin,Ca.95765 (/� <br />
The URL can be used to link to this page
Your browser does not support the video tag.