Laserfiche WebLink
PERTEET <br /> MEMORANDUM <br /> added to sheet NT2. Note added on NT2("Wet Weather Handing And Placement Of Common <br /> Borrow"note 2). <br /> Not Applicable Info: <br /> 1. On Sheet NT2,there are a number of statements that are not applicable to this project.I would <br /> recommend removal.Specifically, language regarding Excavation of Refuse,and Disposal of <br /> Groundwater.Not applicable notes removed from NT2. <br /> Comments Per Paul McKee Email 03/27/2018 <br /> Riverfront Development Grading SWPPP Comments <br /> 1. Please also maintain a 10-foot setback to the existing water main from the toe of the slope at stockpile <br /> 2B.Stockpile revised and note added on sheet STP2 for setback. <br /> 2. Please remove the"City Officials"text from sheet GNl (not a city project) Removed. <br /> 3. If the spine road is going to be kept open for the"Towns" residents as emergency access and not to be <br /> used for truck haul access to Stockpile No.3 and Stockpile No.1, please detail on the plans how <br /> construction access to these stockpiles will be accomplished. Existing construction access road is to be <br /> maintained as shown on sheets KMI andAF1 for both resident/emergency access and truck haul access. <br /> Traffic control measures will be evaluated and provided as needed by the contractor at locations where <br /> the roads intersect. See also the Traffic Control and Haul Route exhibit. <br /> 4. Please label all proposed BMPs on the construction plan with the corresponding BMP#and Description <br /> i.e.—"BMP C150—MATERIALS ON HAND". BMPs labeled with corresponding BMP#on ESCsheets. <br /> 5. Several BMPs are recommended in the SWPPP report but not clearly shown on the construction plan— <br /> please show and label all proposed BMPs on the plan. Comply. The Plans and the SWPPP have been <br /> revised for consistency. <br /> 6. No tracking of dirt or debris will be allowed onto city streets.Self-contained wheel wash systems may be <br /> required at both the Simpson site and the Landfill site—depending on field conditions. Comply. Note <br /> added to sheet NTI(note 3). <br /> Comments Per Michael Brick Email 03/27/2018 <br /> After reviewing the haul route I have the following comments: <br /> 1. The contractor must protect the final lift of asphalt, particularly in areas with public traffic accessing the <br /> occupied residences. Particular attention should be paid to the transition from unfinished to finished <br /> roads and at the access point on the main road south of the roundabout. Notes added to haul route plan <br /> and sheet NT1 to maintain public roads. <br /> 2. A"TRUCK CROSSING"sign or the equivalent should be placed on the main road just south of the <br /> roundabout to notify drivers approaching the haul route to expect large trucks during the project.Sign <br /> shown on sheet KMI <br /> Comments Per Mark Sadler Email 03/22/2018 <br /> Comments on the Everett Riverfront Development Stockpile Plans, March 2018 <br /> General Comments: <br /> 1. Public Works Maintenance Division is in progress of checking on the Consent Decree Development <br /> Checklist process for this project.Applicant should expect the checklist to be prepared and submitted to <br /> Ecology for their project approval. Perteet will follow up with Mark. <br /> Page 2/ ' <br /> File location:\\evt-files\clients\Polygon-Shelter Holdings\Projects G480004-E iverfront Devolp T&M\Submittals\2018-04-13 SP • <br /> Resubmittal\Everett Riverfront Devolp T&M_Comment Response Memo 04-13-18.docx <br />