My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group Inc. 2/8/2021
>
Contracts
>
6 Years Then Destroy
>
2022
>
Jacobs Engineering Group Inc. 2/8/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 10:25:51 AM
Creation date
2/22/2021 10:56:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group Inc.
Approval Date
2/8/2021
Council Approval Date
2/3/2021
End Date
12/31/2022
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
CSO Storage at 36th St, Prelim Engineering
Public Works WO Number
UP3700
Tracking Number
0002775
Total Compensation
$323,082.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Jacobs Engineering Inc. 11/3/2022 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
spreadsheet. <br /> • Action Item and Decision logs. <br /> • Periodic communications documentation as requested. <br /> Task 110 - Quality Control <br /> The Consultant will complete and update the Quality Management Plan, and implement <br /> quality assurance procedures so that project deliverables are subjected to in-house <br /> reviews prior to submittal to the City. These reviews will be conducted under the <br /> direction of the Consultant's Project Quality Assurance Manager, Manager of Projects, <br /> and Project Manager, and will focus on checking the major design elements with respect <br /> to adequacy of response to the specific design challenges, conformance to accepted <br /> design practices, compliance with the City's standards and that the work is of <br /> professional quality meeting the customary standard of care for the type of work in this <br /> locale. <br /> Under individual design tasks,the Consultant will include with each submittal a response to the <br /> City's comments generated from the previous submittal,with an indication either directly on the <br /> review set or in Word format of the actions taken on each comment. City shall provide one <br /> consolidated Word file of all City comments. The Consultant will verify all City comments on <br /> previous submittals have been addressed (or provide written response as to why the changes <br /> have not been made).The Consultant will return with each submittal any agency comments <br /> from the previous submittal. <br /> Deliverables: <br /> The following Deliverables are included in this Task. <br /> • Quality Management Plan, Draft and Final. <br /> Phase 1— Preliminary Engineering (Confirmation of Concept and Proiect <br /> Definition) <br /> Task 200—Alternatives Development and Analysis, Modeling Review, and CSO <br /> Storage Concept Recommendation <br /> The purposes of this task are to receive and review data, previous studies and model outputs <br /> completed by BHC for the City; to generate alternatives for CSO storage; to evaluate <br /> previously modeled CSO volumes and system operations; and to select a preferred CSO <br /> storage alternative to proceed to Phase 2. <br /> 5IPage <br />
The URL can be used to link to this page
Your browser does not support the video tag.