Laserfiche WebLink
spreadsheet. <br /> • Action Item and Decision logs. <br /> • Periodic communications documentation as requested. <br /> Task 110 - Quality Control <br /> The Consultant will complete and update the Quality Management Plan, and implement <br /> quality assurance procedures so that project deliverables are subjected to in-house <br /> reviews prior to submittal to the City. These reviews will be conducted under the <br /> direction of the Consultant's Project Quality Assurance Manager, Manager of Projects, <br /> and Project Manager, and will focus on checking the major design elements with respect <br /> to adequacy of response to the specific design challenges, conformance to accepted <br /> design practices, compliance with the City's standards and that the work is of <br /> professional quality meeting the customary standard of care for the type of work in this <br /> locale. <br /> Under individual design tasks,the Consultant will include with each submittal a response to the <br /> City's comments generated from the previous submittal,with an indication either directly on the <br /> review set or in Word format of the actions taken on each comment. City shall provide one <br /> consolidated Word file of all City comments. The Consultant will verify all City comments on <br /> previous submittals have been addressed (or provide written response as to why the changes <br /> have not been made).The Consultant will return with each submittal any agency comments <br /> from the previous submittal. <br /> Deliverables: <br /> The following Deliverables are included in this Task. <br /> • Quality Management Plan, Draft and Final. <br /> Phase 1— Preliminary Engineering (Confirmation of Concept and Proiect <br /> Definition) <br /> Task 200—Alternatives Development and Analysis, Modeling Review, and CSO <br /> Storage Concept Recommendation <br /> The purposes of this task are to receive and review data, previous studies and model outputs <br /> completed by BHC for the City; to generate alternatives for CSO storage; to evaluate <br /> previously modeled CSO volumes and system operations; and to select a preferred CSO <br /> storage alternative to proceed to Phase 2. <br /> 5IPage <br />