• • <br /> Mr. Kurt Nelson <br /> Rice Fergus Miller <br /> Plan Check Number: B2001-027, First Building Review <br /> February 7, 2020 <br /> appear to be identified in the elevations on Sheet A31.01 as"new solatube". Based on the <br /> ceiling plan, the required openings are approximately two feet in diameter. The proposed work <br /> should be verified. Structural framing to support the interrupted 3x6 roof sheathing should be <br /> provided where new roof penetrations are required. See IBC Sections 107.2.1, 1603.1, and <br /> 1604.1. <br /> 7. The window and door requirements in the construction drawings appear to be incomplete. See <br /> IBC Section 107.2.1. The following comments should be addressed: <br /> a. The drawings do not include an elevation for the new office doors and windows along Grid C <br /> at the Main Level on Sheet A21.01. <br /> b. Elevation 7/A60.01 is referenced for Door B105 in the Basement Level Plan on Sheet <br /> A21.01. The reference to this elevation on Sheet A60.01 is incomplete. <br /> c. The Door Schedule on Sheet A60.01 includes a "Hardware Group"column. The groups are <br /> not defined in the drawings. Additional comments are provided addressing this issue. <br /> d. The Door Schedule on Sheet A60.01 includes a "Glazing"column with multiple doors <br /> including Type"GL-1"glazing. The glazing type is not defined. <br /> e. The door for Restroom 119 is being relocated in the Main Level plan on Sheet A21.01. The <br /> new door location shall be shown as new work. A reference for the door should be provided <br /> on the plans for clarity. <br /> f. Multiple restrooms and a shower are single-user facilities. The Door Schedule on Sheet <br /> A60.01 should specify locking hardware for the facilities. See IBC Section 1210.3.1 <br /> Exception 1 <br /> g. The plans on Sheets A21.01, and the elevations on Sheets A31.01, A60.01, and A70.01, <br /> show new windows. A window schedule should be provided. <br /> h. The project includes windows and doors throughout that will require safety glazing. This <br /> includes glazing in doors and windows adjacent to the doors. The drawings should be <br /> revised to specify safety glazing where required. See IBC Sections 2406.4.1 and 2406.4.2. <br /> Fire Protection: <br /> 8. Detail 1/A02.01 provides sections for fire-rated wall assemblies. The assemblies typically state <br /> "stud framing as defined by the wall type". The minimum wall framing size required by the <br /> testing assembly listing should be stated in the details. See IBC Sections 107.2.1 and 721.1. <br /> 9. Structural Sections 8/S50.01 shows the shaft wall abutting the underside of the roof. The <br /> section details the wall connection such that the rate wall is not continuous to the underside of <br /> the sheathing. The section should be revised. See IBC Section 707.5 <br /> 10. Details 1/A02.01 and 2/A02.01 indicate that wall penetrations will occur through the fire-rated <br /> walls. Details should be provided in the architectural drawings providing tested and listed <br /> firestop assemblies that are compatible with the wall construction. The details should specified <br /> the construction of the firestop assembly as indicated in the listing. See IBC Sections 107.2.1 <br /> and 714.3. <br /> 0 3200 Cedar Street 0 425.257.8810 O everetteps@everettwa.gov <br /> Everett,WA 98201 425.257.8857 fax everettwa.gov/ er its <br /> Page 3 of 8 <br />