• <br /> Everett Housing Authority <br /> Administrative Office Upgrades <br /> 03/24/20 <br /> Page 3 <br /> needed, including coordination between the architectural and structural drawings. See <br /> IBC Section 107.2.1. <br /> ANSWER; Detail of mechanical doghouse has been added to sheetA71.01. <br /> 6. The Reflected Ceiling Plan on Sheet A22.01 includes four new ceiling daylighting <br /> devices. The"Lighting" notes indicate the devices are sized to"match existing". <br /> However, record documents do not indicate the presence of roof penetrations at these <br /> locations. Note that the devices appear to be identified in the elevations on Sheet <br /> A31.01 as"new solatube". Based on the ceiling plan, the required openings are <br /> approximately two feet in diameter. The proposed work should be verified. Structural <br /> framing to support the interrupted 3x6 roof sheathing should be provided where new <br /> roof penetrations are required. See IBC Sections 107.2.1, 1603.1, and 1604.1. <br /> ANSWER: 2 solatubes currently exist on the building. This work will add 2 <br /> solatubes on the root Notes have been added regarding additional 2 x 6 <br /> framing to support the interrupted 3x6 roof sheathing at each roof <br /> penetration. See the attached aerial photo showing the existing solatubes. <br /> In the originally submitted drawings they were located incorrectly. They <br /> have been shifted to their correct locations. <br /> 7. The window and door requirements in the construction drawings appear to be <br /> incomplete. See IBC Section 107.2.1. The following comments should be addressed: <br /> a. The drawings do not include an elevation for the new office doors and windows <br /> along Grid C at the Main Level on Sheet A21.01. <br /> b. Elevation 7/A60.01 is referenced for Door B105 in the Basement Level Plan on Sheet <br /> A21.01. The reference to this elevation on Sheet A60.01 is incomplete. <br /> c. The Door Schedule on Sheet A60.01 includes a "Hardware Group"column. The <br /> groups are not defined in the drawings. Additional comments are provided <br /> addressing this issue. <br /> d. The Door Schedule on Sheet A60.01 includes a "Glazing"column with multiple doors <br /> including Type"GL-1"glazing. The glazing type is not defined. <br /> e. The door for Restroom 119 is being relocated in the Main Level plan on Sheet <br /> A21.01. The new door location shall be shown as new work. A reference for the <br /> door should be provided on the plans for clarity. <br /> f. Multiple restrooms and a shower are single-user facilities. The Door Schedule on <br /> Sheet A60.01 should specify locking hardware for the facilities. See IBC Section <br /> 1210.3.1 Exception 1 <br /> g. The plans on Sheets A21.01, and the elevations on Sheets A31.01, A60.01, and <br /> A70.01, show new windows. A window schedule should be provided. <br /> h. The project includes windows and doors throughout that will require safety glazing. <br /> This includes glazing in doors and windows adjacent to the doors. The drawings <br /> should be revised to specify safety glazing where required. See IBC Sections <br /> 2406.4.1 and 2406.4.2. <br /> ANSWER: <br />