Laserfiche WebLink
• • <br /> Everett Housing Authority <br /> • Administrative Office Upgrades <br /> 03/24/20 <br /> Page 4 <br /> a. Elevation for doors and windows along grid C was considered similar to <br /> the intent of elevations 5& 6 on sheetA70.01. A new elevation <br /> 21/A70.01 has been added. <br /> b. Elevation 7/A60.O1 is the door elevation viewed from Corridor 100. The <br /> elevation was removed from sheet A60.01 and inserted as 20/A70.01 and <br /> consistently the elevation bug on sheetA21.01 has been changed to <br /> 20/A70.01. <br /> c. The Door Schedule on sheet A60.01 correctly fists hardware groups. The <br /> actual hardware group descriptions are listed in the Specification. Section <br /> 087100 "Door Hardware"has been included with this response. <br /> d. See the revised A60.01 sheet with the addition of notes regarding Safety <br /> Glazing(SG)as well as a description of the construction of the Safety <br /> Glazing. <br /> e. The door, frame, and hardware for Restroom 119 is to be relocated in its <br /> entirety. Notes have been added to sheetA23.01 and to the Door <br /> Schedule on SheetA60.01 to reflect this work. <br /> f. The Door Schedule on Sheet A60.01 correctly lists hardware groups. The <br /> actual hardware group descriptions are listed in the Specification. The <br /> hardware for each of these doors include locking privacy hardware. <br /> Section 087100 "Door Hardware"has been included with this response. <br /> g. The storefront listed on sheet A20.01 (Main Floor Plan)and the exterior <br /> elevations on sheetA31.O1 is the only new exterior glazing. Elevations of <br /> this storefront is on A60.01. All other windows that are added in this <br /> project are interior windows and are meant to match the size of existing <br /> interior windows. Notes have been added to verify the size of existing <br /> interior windows onsite and match their dimensions. Also see revised <br /> sheetA60.01 for addition of Interior Window Types. <br /> h. The door types with glazing on Sheet A60.01 have been updated to list SG <br /> for Safety Glazing. Also, the Door Hardware Schedule has been updated to <br /> include the same nomenclature. <br /> Fire Protection: <br /> 8. Detail 1/A02.01 provides sections for fire-rated wall assemblies. The assemblies <br /> typically state"stud framing as defined by the wall type". The minimum wall framing <br /> size required by the testing assembly listing should be stated in the details. See IBC <br /> Sections 107.2.1 and 721.1. <br /> ANSWER; Detail 1/AO2.01 has been updated to include the minimum wall <br /> framing size required by the testing assembly fisted for all rated wall types. <br /> 9. Structural Sections 8/S50.01 shows the shaft wall abutting the underside of the roof. <br /> The section details the wall connection such that the rated wall is not continuous to the <br /> underside of the sheathing. The section should be revised. See IBC Section 707.5 <br /> ANSWER; Detail 8/550.01 has been updated per the comment. <br /> 7 <br />