My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3107 COLBY AVE 2021-03-31
>
Address Records
>
COLBY AVE
>
3107
>
3107 COLBY AVE 2021-03-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2021 2:54:10 PM
Creation date
3/31/2021 2:53:07 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
3107
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• i <br /> Everett Housing Authority <br /> • Administrative Office Upgrades <br /> 03/24/20 <br /> Page 5 <br /> 10. Details 1/A02.01 and 2/A02.01 indicate that wall penetrations will occur through the fire- <br /> rated walls. Details should be provided in the architectural drawings providing tested <br /> and listed firestop assemblies that are compatible with the wall construction. The details <br /> should specify the construction of the firestop assembly as indicated in the listing. See <br /> IBC Sections 107.2.1 and 714.3. <br /> ANSWER: Details 1/A02.01 and 2/A02.01 have been corrected to include 11L <br /> rated penetration firestop assemblies that are compatible with the wall <br /> construction. <br /> 11. Enlarged Elevator Plan 2/A40.01 shows the elevator shaft at the Main Level. The Main <br /> Level Framing Plan on Sheet S21.01 specifies HSS columns that interrupt the fire <br /> barriers around the shaft. The columns should be shown in Plan 2/A40.01. The <br /> designer-of-record should verify that the required fire protection is not reduced by the <br /> columns interrupting the barriers. See IBC Sections 3002.1, 713.2, 713.4, and 721.1. <br /> ANSWER: The vertical circulation sheet A40.01 has been corrected to frame <br /> the shaft walls around the hoist beam columns. By doing so the HSS columns <br /> no longer interrupt the tire barriers around the shaft, See the revised sheet <br /> A40.01. <br /> Egress: <br /> 12. The Main Level Plan on Sheet A21.01 includes a new elevator. The elevator should <br /> specify providing a two-way communication system at each landing. See IBC Section <br /> 1009.8. <br /> ANSWER: The elevator specification has been corrected to include a <br /> two-way communication system at each landing per IBC Section <br /> 1009.8, Section 0142400 'Hydraulic Elevators Otis"has been included <br /> with this response. <br /> Accessibility: <br /> 13. The Main Level Plan on Sheet A21.01 and the elevations on Sheet A31.01 include new <br /> exterior Door 162. The door is required to be accessible. However, it is provided with <br /> less than a 48-inch clearance to the stair edge. The Door Schedule specifies Hardware <br /> Group HW-6; the group is not defined in the drawings, but anticipated to include a door <br /> closer. The minimum door clearance should be 54 inches. Note that the door is <br /> required to be accessible regardless of whether it is located on an accessible route. See <br /> IBC Sections 1101.2 and 1103.1, and ICC A117.1-09 Figure 404.2.3.2(f). <br /> ANSWER: The north wall of the glass endosure has been shifted south <br /> in order to provide the required clearance to the stair edge. The <br /> Hardware group HW-6 includes panic hardware for egress at this door. <br /> Section 087100 "Door Hardware"has been included with this response. <br />
The URL can be used to link to this page
Your browser does not support the video tag.