Laserfiche WebLink
Activities/Approach: <br /> • Contact pipe testing laboratories to determine options for testing representative samples of the <br /> existing hypochlorite pipe to estimate the remaining useful service life of the existing piping_ <br /> • Develop a cost estimate for pipe material testing and recommendations of locations for <br /> gathering pipe samples within the hypochlorite facility. <br /> • Contact pipe manufacturers and suppliers to identify the universe of the pipe materials suitable <br /> for conveying hypochlorite solutions. <br /> • Assemble performance data and market availability for each pipe material. <br /> • Gather pipe and fitting material costs from pipe suppliers and develop a representative cost <br /> estimate for the replacement of the hypochlorite pipe. <br /> • Compare the available pipe materials based on performance characteristics, representative cost <br /> estimates, and operation and maintenance criteria. <br /> • Develop a recommendation for the pipe material best suited for the replacement of PVC <br /> hypochlorite pipe. Review recommendations with BC senior technical staff. <br /> • Develop a short(maximum 10 page)technical memo summarizing pipe material alternatives <br /> and a recommendation for replacement pipe material. <br /> Everett Responsibilities <br /> • Provide input pipe material evaluation criteria. <br /> Work Products <br /> • Sodium Hypochlorite Pipe Material Replacement Analysis technical memorandum, draft and <br /> final. <br /> Task 111b.Generator Design Review(completed) <br /> Activities/Approach:The City requested that BC provide advisory review related to the City's Water <br /> Filtration Plant generator replacement project. Specifically, BC was requested to review draft interim <br /> design materials, and to provide feedback on key considerations that the City should take into <br /> account in selecting voltage for a new power generation system at the WFP. <br /> Support includes: <br /> • Review design and background materials provided by the City <br /> • Participate in conference calls with City staff to verify understanding of operational needs and <br /> discuss key considerations for City staff <br /> • Deliver feedback in the form of written and verbal key considerations for generator selection <br /> Everett Responsibilities <br /> • Provide design and background materials to support the review. <br /> • Participate in design review conference calls. <br /> Work Products <br /> • Written and verbal key comments on key considerations for City selection of a new medium <br /> voltage (12.47 kV) or low voltage (480V) replacement generator system. <br /> Task 111c. Finished Water Pump Station Assessment(partially completed.future work remaining) <br /> Activities/Approach:To be determined, based on City requests. No work will be completed under this <br /> task without written direction from the City. <br /> Page 3 of 8 <br />