My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> ' 2-02.3(5) Abandon Pipe In-place <br /> (******) <br /> Plug pipe ends of pipes designated on Plans being abandoned in-place using commercial <br /> concrete. If designated on Plans, fill abandoned in-place pipe with Controlled Density Fill as <br /> specified in 2-09.3(1)E. <br /> 2-02.3(6) Sawing and Line Drilling <br /> (******) <br /> Saw-cut to full depth mortared decorative or special pavement including, but not limited to, brick, <br /> ' cobblestone or paver block along a neat line with intent of salvaging as many units as possible. <br /> When line drilling, drill holes at maximum center-to-center spacing of six-inches. Drill holes <br /> perpendicular to the surface and penetrate completely through the pavement. <br /> When the Plans indicate, or the Engineer requires, saw-cutting pavement that is comprised of a <br /> rigid base and asphalt overlay, saw cut the rigid base to the minimum depth as follows: <br /> a. For concrete rigid base, saw cut to a depth of 2/3 the thickness of the rigid base. <br /> ' b. For rigid base constructed with mortared decorative or special pavement including, but <br /> not limited to, brick, cobblestone, or paver block, or a combination of such materials <br /> saw cut to full depth of the rigid base along a neat line with intent to salvage as many <br /> special pavement units as possible. <br /> 2-02.3(7) Salvage <br /> (******) <br /> ' Carefully salvage and deliver to the Owner in good condition, all materials of recoverable value <br /> taken from the discarded facilities, unless otherwise indicated. Materials and things deemed of <br /> no value by the Engineer shall become the Contractor's property to be removed and properly <br /> disposed. <br /> Remove excess concrete, debris and dirt from castings and other materials the Engineer <br /> designates suitable for salvage and that are not to be re-used elsewhere on the Project. Deliver <br /> salvage castings and materials to the location designated by the Engineer. <br /> 2-02.3(8) Waste Disposal <br /> (******) <br /> ' Provide waste site for disposal of materials not required for construction. Arrange waste disposal <br /> at no expense to the City. Waste disposal shall meet the requirements of 2-03.3(7)C of the <br /> Standard Specifications. <br /> ' 2-02.3(9) Abandon Existing Water Valves In-place <br /> (******) <br /> Prior to abandoning existing water valves in-place, coordinate with City to have City forces close <br /> valve. After City forces verify valve is closed, remove valve box and extension, if any, and backfill <br /> with Gravel Borrow as specified in 9-03.14(1). Compact backfill to a minimum of 95 percent <br /> maximum density in accordance with 2-03.3(14)D. <br /> 2-02.4 Vacant <br /> Revise 2-02.4 as follows: <br /> 2.02.4 Measurement <br /> ' Bid items of Work completed pursuant to the Contract Documents will be measured as described <br /> in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> For curb and gutter cement removal with concrete pavement, the curb and gutter will be <br /> considered as pavement removal and the measurement for payment will be to the back of the <br /> curb. <br /> ' SEI to SRI Intertie,SROB Rehab Division 2-EARTHWORK WO No.-UP3714 <br /> SP-129 <br />
The URL can be used to link to this page
Your browser does not support the video tag.