Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 2-02.5 Payment <br /> Delete all paragraphs in 2-02.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> If there is no bid item to cover pavement removals, then they shall be included with the <br /> construction of the respective Work including, but not limited to, combined sewer pipe, water <br /> main, water service line, manhole, side sewer pipe, storm drain pipe, catch basins, and <br /> underground utility vaults. ' <br /> Include curb and gutter and sidewalk removal with construction of the respective Work including, <br /> but not limited to, combined sewer pipe,water main, water service line, manhole, side sewer pipe, <br /> storm drain pipe, catch basins, and underground utility vaults with no direct compensation made. <br /> If there is no pay item for pipe abandonment, then it shall be included with the construction of the <br /> respective Work including, but not limited to, sewer or storm drain pipe, water main, manhole, <br /> catch basin or side sewer with no direct compensation made. <br /> If there is no pay item for existing valve abandonment, then it shall be included with the <br /> construction of other items of Work with no direct compensation made. <br /> 2-03 ROADWAY EXCAVATION AND EMBANKMENT ' <br /> 2-03.1 Description <br /> Supplement 2-03.1 by adding the following: <br /> This Work applies to street pavement patching and street reconstruction after completion of utility <br /> work. Grading for street reconstruction shall conform to COE Standard Drawing No. 302, unless <br /> otherwise noted on the Plans. Grading for pavement patching shall conform to COE Standard <br /> Drawing No. 326, unless otherwise noted on the Plans. <br /> 2-03.2 Vacant <br /> Revise 2-03.2 as follows: <br /> 2.03.2 Materials <br /> Materials shall meet the requirements of the following: <br /> Foundation Material Class A or B 9-03.17 Standard Specifications <br /> Gravel Borrow 9-03.14(1) Standard Specifications <br /> 2-03.3 Construction Requirements <br /> Supplement 2-03.3 by adding the following: I <br /> Blasting is not allowed within the City limits of Everett. <br /> Use suitable excavated material for roadway embankments. Dispose of surplus excavated <br /> material or unsuitable material in accordance with 2-03.3(7). <br /> Engineer will not approve payment for unauthorized excavation or embankment, or both, beyond <br /> the limits indicated on the Plans. Return areas of unauthorized excavation or embankment, or <br /> both, to their original conditions or better at the Contractor's expense. <br /> Fine grading in fill or backfill areas shall begin within the top six inches of subgrade. Final grading <br /> shall produce a uniform surface within established tolerances and without abrupt changes in <br /> grade. <br /> Construction requirements for pavement patching authorized by Engineer outside of Project limits <br /> shall be in accordance with the Section 5-04 and City Standard Drawing No. 326 for existing <br /> asphalt concrete over prepared grade. I <br /> Provide temporary drainage to keep the subgrade free from standing water. <br /> SEI to SRI Intertie, SRO8 Rehab Division 2-EARTHWORK WO No.-UP3714 <br /> SP-130 <br />