Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> The Contractor shall prepare and submit a Temporary Erosion and Sediment Control ' <br /> (TESC) Plan consisting of a narrative section and plan sheets that meet the Washington <br /> State Department of Ecology's Stormwater Pollution Prevention Plan (SWPPP) <br /> requirement in the CSWGP. A draft SWPPP has been prepared for this project and is <br /> available upon request <br /> The Contractor may adopt the TESC measures indicated in the Drawings in preparing <br /> the TESC Plan. The Contractor shall complete and modify the TESC Plan to meet the <br /> Contractor's schedule and method of construction. All TESC Plans shall meet the <br /> requirements of the current edition of the Department of Ecology's Stormwater <br /> Management Manual for Western Washington and be adapted as needed throughout111 <br /> construction based on site inspections and discharge samples to maintain compliance <br /> with the CSWGP. The Contractor shall develop a schedule for implementation of the <br /> TESC work and incorporate it into the Contractor's progress schedule. 1 <br /> TESC plan shall be continually updated as site conditions change and erosion control <br /> measures are adjusted. The Contractor shall provide an updated TESC plan for review <br /> when requested by the Engineer. <br /> The Contractor's adoption of the TESC Plans as shown in the Plans shall be submitted <br /> as a Type 1 Working Drawing. Modified TESC Plans shall be submitted as Type 2 <br /> Working Drawings. <br /> Failure to accept all or part of any such Plan will not make the Contracting Agency liable <br /> to the Contractor for any Work delays. <br /> The Contractor shall prepare and submit a Temporary Erosion and Sediment Control <br /> (TESC) Plan consisting of a narrative section and plan sheets meeting the requirements <br /> of Chapter 2 of the Design and Construction Standards and Specifications. <br /> The Contractor may adopt the TESC measures indicated in the Drawings in preparing <br /> the TESC Plan. The Contractor shall complete and modify the TESC Plan to meet the <br /> Contractor's schedule and method of construction, but the modified plan shall provide <br /> at least an equivalent level of erosion protection as the measures included in the <br /> Drawings. All TESC Plans shall be adapted as needed throughout construction based <br /> on site inspections. The Contractor shall develop a schedule for implementation of the <br /> TESC work and incorporate it into the Contractor's progress schedule. <br /> At the request of the Engineer updated TESC Plans shall be prepared and provided to <br /> the City. <br /> The Contractor's adoption of the TESC Plans as shown in the Plans shall be submitted <br /> as a Type 1 Working Drawing. Modified TESC Plans shall be submitted as Type 2 <br /> Working Drawings. <br /> Failure to accept all or part of any such Plan will not make the Contracting Agency liable <br /> to the Contractor for any Work delays. <br /> 8-01.3(1)B Erosion and Sediment Control (ESC) Lead <br /> Revise the second and third paragraphs in 8-01.3(1)B to read as follows: <br /> The ESC Lead shall implement the TESC Plan. Implementation shall include, but is not <br /> limited to: <br /> 1. Installing and maintaining all temporary erosion and sediment control Best <br /> Management Practices (BMPs) included in the TESC Plan to assure <br /> continued performance of their intended function. Damaged or inadequate <br /> TESC BMP's shall be corrected immediately. <br /> 2. Updating the TESC Plan to reflect current field conditions. <br /> SEI to SRI Intertie,SRO8 Rehab Division 8-MISC CONSTRUCTION WO No.-UP3714 <br /> SP-153 <br />