Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> of the work. Contractor is required to obtain a Discharge Authorization (DA) permit from the City in <br /> advance. <br /> Bid Item 8: Foundation Material, Class A or B <br /> Measurement and Payment: Unit Price per Ton (TON) <br /> Measurement for Foundation Material, 2-inch to 4-inch quarry spalls, shall be by the ton, recorded <br /> on certified weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT, and placed within <br /> the limits of dimensions defined in the Work, descriptions for other bid items, shown on the Plans, <br /> or COE Standard Drawings, or as otherwise approved by the Engineer. <br /> The unit price bid per ton shall constitute full compensation for all labor, tools, materials and <br /> equipment required to furnish, place, and compact foundation material as specified in the Standard <br /> Specifications, these Special Provisions and as shown on COE Standard Drawing No. 614. <br /> The unit price for this bid item includes all costs for over-excavation, removal, haul, and disposal <br /> of unsuitable subgrade material below the pipe zone or structure subgrade. 1 <br /> Bid Item 9: Gravel Borrow <br /> Measurement and Payment: Unit Price per Ton (TON) <br /> Measurement for Gravel Borrow shall be by the ton, recorded on certified weight tickets in <br /> accordance with 1-09.2 WEIGHING EQUIPMENT, and placed within the limits of dimensions <br /> defined in the Work, descriptions for other bid items, shown on the Plans, or COE Standard <br /> Drawings, or as otherwise approved by the Engineer. <br /> Measurement for gravel borrow shall be limited to maximum trench widths defined in the work <br /> descriptions for other bid items. <br /> The unit price per ton, based on certified weight tickets,for gravel borrow shall be full compensation <br /> for all labor, material, tools and equipment necessary to furnish imported gravel borrow for trench <br /> backfill where Engineer has determined native soils are not suitable for backfill, and other Work as <br /> required, from a Contractor-supplied source in accordance with 2-03.3(14)J of the Standard <br /> Specifications and these Special Provisions. <br /> The unit price for gravel borrow shall include all costs of furnishing, hauling, stockpiling, placing, <br /> grading and compacting the material in place. <br /> The unit price for this bid item includes all costs for removing, loading and disposing of displaced <br /> unsuitable material, including haul. <br /> Bid Item 10: Crushed Surfacing Top Course ' <br /> Measurement and Payment: Unit Price per Ton (TON) <br /> Measurement for crushed surfacing top course will be by the ton as recorded on certified weight <br /> tickets in accordance with 1-09.2 WEIGHING EQUIPMENT and limited to dimensions defined in <br /> the Work, descriptions for other bid items, shown on the Plans, details or COE Standard Drawings <br /> or as otherwise approved by the Engineer. Crushed Surfacing Top Course material placed 111 <br /> exceeding "neatline" quantities without advance authorization by the Inspector will not be paid for. <br /> The unit price per ton shall be full compensation for all labor, compaction, material, tools, and <br /> equipment necessary to furnish, haul, stockpile, place, grade, and compact imported crushed <br /> surfacing top course for the Work as required, from a Contractor supplied source in accordance <br /> with the Standard Specifications and these Special Provisions. <br /> The unit price for crushed surfacing top course also includes all costs for controlling moisture <br /> content. , <br /> SEI to SRI Intertie,SRO8 Rehab Division B—BID ITEM DESCRIPTIONS WO No.—UP3714 <br /> SP-14 <br />