Laserfiche WebLink
I <br /> I CITY OF EVERETT SPECIAL PROVISIONS <br /> Also included in this bid item shall be the cost of all equipment required to remove existing soils to <br /> attain proper elevations, compaction of native subgrade soils, as well as to uniformly spread and <br /> I compact the crushed surfacing material. <br /> The unit price for this bid item includes all costs for removing, loading and disposing of displaced <br /> unsuitable material, including haul. <br /> I Include in this bid item the cost of sprinkling during dry periods prior to placement of the crushed <br /> surfacing and while spreading and compacting the material. <br /> Payment for crushed surfacing top course will be by the ton of material placed and approved by <br /> Ithe Inspector. <br /> I Bid Item 11: Crushed Surfacing Base Course <br /> Measurement and Payment: Unit Price per Ton (TON) <br /> Measurement for crushed surfacing base course will be by the ton as recorded on certified weight <br /> I tickets in accordance with 1-09.2 WEIGHING EQUIPMENT and limited to dimensions defined in <br /> the Work, descriptions for other bid items, shown on the Plans, details or COE Standard Drawings <br /> or as otherwise approved by the Engineer. In addition to surfacing, this product will be paid by the <br /> I ton for sewer and storm pipe bedding. Crushed Surfacing Base Course material placed exceeding <br /> "neatline" quantities without advance authorization by the Inspector will not be paid for. <br /> The unit price per ton shall be full compensation for all labor, compaction, material, tools, and <br /> I equipment necessary to furnish, haul, stockpile, place, grade, and compact imported crushed <br /> surfacing base course for the Work as required, from a Contractor supplied source in accordance <br /> with the Standard Specifications and these Special Provisions. <br /> I Where Class 1 Stone for Pipe zone backfill and bedding is substituted for crushed surfacing base <br /> course, where allowed in the plans, all costs for providing Class 1 Stone in accordance with Special <br /> Provision Section 9-03.23, shall be included in this bid item. <br /> I The unit price for crushed surfacing base course also includes all costs for controlling moisture <br /> content and all costs for dewatering. <br /> Also included in this bid item shall be the cost of all equipment required to remove existing soils to <br /> I attain proper elevations, compaction of native subgrade soils, as well as to uniformly spread and <br /> compact the crushed surfacing material. <br /> The unit price for this bid item includes all costs for removing, loading and disposing of displaced <br /> I unsuitable material, including haul. <br /> Include in this bid item the cost of sprinkling during dry periods prior to placement of the crushed <br /> surfacing and while spreading and compacting the material. <br /> I Payment for crushed surfacing base course will be by the ton of material placed and approved by <br /> the Inspector. <br /> IBid Item 12: Ductile Iron Sewer Pipe, Fittings, Valves for Intertie, 30-inch <br /> Measurement and Payment: Lump Sum (LS) <br /> I The lump sum bid for the type and size of sewer pipe shall be full compensation for all labor, <br /> material, incidentals, tools and equipment necessary to satisfactorily complete the work as defined <br /> in these Contract Documents and includes, but is not limited to the following: <br /> I Furnishing, hauling, and assembling in place the completed installation and testing, including all <br /> pipes, tees, special fittings, valves, joint bonding, joint materials and adjustment of inverts for the <br /> completion of the installation to the required lines and grades. <br /> ISEI to SRI Intertie,SRO8 Rehab Division B-BID ITEM DESCRIPTIONS WO No.-UP3714 <br /> SP-15 <br /> I <br />