Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Trench excavation; hauling and disposing of surplus material; furnishing, stockpiling, hauling and <br /> placing and compacting suitable native backfill; pressure testing and inspecting pipe; concrete <br /> removal and penetration into SRO8 outfall structure, connecting pipe to existing structures or other <br /> pipes; protecting and maintaining existing utilities.All costs associated with jointing dissimilar types <br /> of sewer pipe, fittings or valves with a coupling or adapter shall be included in this bid item. <br /> Furnishing, hauling and placing of crushed surface base course for pipe zone bedding shall be paid <br /> under"Crushed Surfacing Base Course". Furnishing, hauling and placing of import trench backfill <br /> (Gravel Borrow) shall be paid under"Gravel Borrow". <br /> The City will operate existing valves on the sewer system to enable the existing (pressurized) 36- <br /> inch diameter sewer pipe to be isolated, depressurized and drained. The contractor will provide all <br /> equipment and forces necessary to drain sewage from the existing pipe prior to installing the cut- <br /> in tee. <br /> The Engineer has identified 6 pothole locations on the plans that are required and the costs for <br /> those potholes shall be considered as incidental to the work defined in this bid item. Additional <br /> potholes, if approved by the City, will be paid by Force Account. <br /> Bid Item 13: Sewer Saddle Manhole on SRO8 Pipe <br /> Measurement and Payment: Lump Sum (LS) , <br /> The Lump Sum price for this manhole structure shall be full compensation for all labor, <br /> material, tools and equipment necessary to satisfactorily complete the work as defined in <br /> these Contract Documents and includes, but is not limited to: <br /> Furnishing, hauling, and assembling in place the completed installation including a <br /> reinforced concrete cast-in-place base, pre-cast concrete manhole sections, frames and <br /> covers, special connection to the existing pipe, placement of water stops, joint sealants <br /> and gaskets, and fittings and fasteners to resist joint separation due to uplift thrust. <br /> Excavation; hauling and disposing of surplus or unsuitable material; dewatering; sewer <br /> flow bypassing; furnishing and installing couplings; grouting, furnishing and installing <br /> steps or ladder; placing and compacting native backfill; furnishing, placing, and ' <br /> compacting subgrade material. All costs for over-excavation, removal, haul, and disposal <br /> of unsuitable subgrade material below the pipe zone or structure subgrade and <br /> placement of foundation material is in a different bid item. ' <br /> Measurement will be based on the percentage of the work defined in this bid item that is completed <br /> at the time of measurement. <br /> Bid Item 14: Hinged Manway in SRO8 Structure <br /> Measurement and Payment: Lump Sum (LS) , <br /> The Lump Sum price for this work shall be full compensation for all labor, material, tools <br /> and equipment necessary to satisfactorily complete the work as defined in these Contract <br /> Documents and includes, but is not limited to: <br /> Removing and disposing of the existing steel plate cover and anchor bolts and preparing <br /> existing concrete surfaces to accept the new access hatch assembly as shown on the ' <br /> plans. Installing anchor bolts, hatch assembly, gaskets and related hardware <br /> SEI to SRI Intertie,SRO8 Rehab Division B—BID ITEM DESCRIPTIONS WO No.—UP3714 <br /> SP-16 <br />