My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2801 OAKES AVE 2022-02-24
>
Address Records
>
OAKES AVE
>
2801
>
2801 OAKES AVE 2022-02-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2022 11:18:00 AM
Creation date
5/3/2021 3:36:28 PM
Metadata
Fields
Template:
Address Document
Street Name
OAKES AVE
Street Number
2801
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />0 <br />VBotesch, Nash & Hall <br />Architects, RS. <br />April 6, 2020 <br />Formal Resubmittal June 8, 2020 <br />City of Everett <br />3200 Cedar Street <br />Everett, WA 98201 <br />Attn: Mr. Drew Martin <br />Re: Owner: City of Everett <br />Job Address: 2801 Oakes Avenue <br />Plan Check Number: B2001-004, First Building Review <br />Dear Drew, <br />This letter is our formal response to your Second Review email received April 20, 2020 requesting an <br />additional clarification/response. The following are the outstanding items I responded to informally in our <br />recent email correspondence: <br />Architectural <br />Accessibility: <br />3. The project involves Level 2 Alterations to the building per IEBC Chapter 8. Accessibility <br />improvements per IEBC Section 705.2 should be included in the project. Potentially inaccessible <br />elements include, but are not limited to, the second floor bathrooms, stairs, ramps including handrails, <br />entryway doors, drinking fountains, and parking including striping and signage. Where the building is <br />made to be less than fully -accessible per one of the exceptions, documentation substantiating the <br />limited accessibility improvements should be submitted for review. Where Exception 1 is used, the <br />documentation should itemize the improvements and estimated cost of work associated with each <br />item. See IEBC Section 806.1. <br />The following are accessibility improvements part of this project scope of work as discussed on our <br />building walk-thru with Tony Lee and Ruben Sanchez on 7-24-19: <br />1 ) Adding Toilet Room #112 <br />2) Remodeling existing Toilet Room #111 <br />3) Replacing non -compliant knob door hardware on existing doors <br />4) Demolition of existing security door and wall enclosure located on the stair landing <br />5) Adding new handrails at the stairway <br />6) Demolition of an existing doorway that is not accessible <br />7) First Floor area is to receive self -leveling concrete underlayment to level uneven floor area — See <br />Demo Plan Sheet AD1. 1 for area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.