Laserfiche WebLink
o MR#5: On-site Stormwater Management <br /> ■ Page 9—Remove remnant discussion about porous pavement and check all <br /> text throughout the Drainage Report for accuracy. <br /> The new drainage report is proposing permeable asphalt for the replaced <br /> hard surface area in Basin A. See new drainage report and plan set. <br /> • Add discussion of Downspout Full Infiltration, including the assessment of <br /> site feasibility assessment and design and sizing calculations per the criteria in <br /> Volume III, Section 3.1.1 of the SWMMWW. <br /> Downspout full infiltration is no longer being proposed. <br /> • Bioretention design and modeling: <br /> • Section 4-4.1 (3) SETBACKS of the DCSS requires a 10-ft etback <br /> from the open water maximum surface elevation or edge of a <br /> stormwater facility to property lines and on-site structures. Please <br /> revise the designs to meet this requirement. <br /> Bioretention is no longer being proposed. <br /> • Please check and update WWHM inputs needed. For example, BR#1 <br /> input as 5'x208', but the bottom length appears smaller than this on <br /> the figure Drainage Basin Plan, and the area in the model (0.24 acres) <br /> does not match the area shown on the figure (.03 acres). <br /> Bioretention is no longer being proposed. <br /> • The bypass areas shown on the Drainage Basin Map do not appear to <br /> have been entered into the model, and they appear smaller than the <br /> actual area that would bypass based on the grading plan(Sheet 3). <br /> Please update the bypass areas to delineate the actual amount of <br /> bypass area consistent with the grading plan and enter those bypass <br /> areas into the model. <br /> Bioretention is no longer being proposed. <br /> • The right-of-way sidewalk areas do not appear to be entered into the <br /> model. Assuming the sidewalks grade toward the street and away from <br /> the bioretention facilities,they should be included as part of the model <br /> bypass area. <br /> Bioretention is no longer being proposed. <br /> PO Box 1478 • Everett, WA 98206 • Phone: (425) 303-9363 <br /> Fax: (425)303-9362 • Email:info@insightengineering.net <br /> 37 <br />