My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8525 EVERGREEN WAY BURGER KING 2021-05-10
>
Address Records
>
EVERGREEN WAY
>
8525
>
BURGER KING
>
8525 EVERGREEN WAY BURGER KING 2021-05-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2021 11:25:55 AM
Creation date
5/4/2021 10:41:28 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8525
Tenant Name
BURGER KING
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Apply a Ksat correction factor of 2 or 4 to the Soil Layer 1 <br /> "SWMMWW 12in/hr"per page 7-15, Volume V in the SWMMWW. <br /> Bioretention is no longer being proposed. <br /> • For roof areas fully infiltrated via Downspout Full Infiltration(BMP <br /> T5.10A),those areas need not be entered into the model. See Volume <br /> III, Section 3.1.1 of the SWMMWW. <br /> Bioretention is no longer being proposed. <br /> • The bioretention planter detail (Sheet 3) shows an underdrain, but the <br /> modeling does not account for the underdrain. Update the model to <br /> reflect the actual designs.Note that this, along with addition of liners <br /> and update bypass areas, may result in significant discrepancy in BMP <br /> sizing. <br /> Bioretention is no longer being proposed. <br /> o MR#6: Runoff Treatment <br /> o Provide a listing of the water quality menus used (Chapter 3, Volume V of the <br /> SWMMWW). <br /> Both basins are exempt from water quality under the new proposal. See revised <br /> drainage report. <br /> o Document whether the volume treated meets or exceeds the 91%treatment <br /> requirement based on the modeling. <br /> Both basins are exempt from water quality under the new proposal. See revised <br /> drainage report. <br /> o Document how bypass areas were handled in the modeling and how the treatment <br /> requirement is met even with the bypass areas proposed. <br /> Both basins are exempt from water quality under the new proposal. See revised <br /> drainage report. <br /> o For MR#8: Wetlands Protection <br /> o The City's previous comments were not addressed. <br /> o The applicability of MR#8—Wetlands Protection is not determined based on <br /> whether wetlands exist on or adjacent to the site,but rather based on whether the <br /> project site discharges to wetlands. <br /> MR#8 has been addressed in the new drainage report. See new drainage report. <br /> PO Box 1478 • Everett, WA 98206 • Phone: (425) 303-9363 <br /> Fax: (425) 303-9362 • Email:info@insightengineering.net <br /> (y/� <br />
The URL can be used to link to this page
Your browser does not support the video tag.