Laserfiche WebLink
Earth Solutions NWtLC <br />ESNW Rep. <br />Project No. <br />Page <br />Report No. <br />EMH <br />4938.10 <br />1 of 1 <br />105 <br />15365 NE 90'' Street, Suite 100 <br />Time On Site <br />Time Off Site <br />Date <br />Day of Week <br />Redmond, WA 98052 <br />Main (425) 449-4704 1 Fax (425) 449-4711 <br />10:00 AM <br />12 300 <br />11:30 AM <br />3 on PM <br />1 /8/20 <br />Wed <br />www.esnw.com <br />DAILY FIELD REPORT <br />Travel Time <br />30 Min + 30 Min <br />Weather <br />400s F, Cloud <br />Project Name <br />Riverview Apartments <br />Job Location <br />1616 East Marine <br />View Drive, Everett <br />Client/Owner <br />Heartland <br />Construction LLC <br />General Contractor Contact Field Supervisor Reviewed <br />Heartland Construction Barry LAC * `fly <br />Grading Contractor Contact Project Manager Reviewed <br />Aero Construction Scott Adams RAC <br />Are approved plans/permits on site? Yes Project No. Permit No. <br />At the client's request, ESNW Rep was on site to observe remedial excavation stability and backfill activity, collect a proctor <br />sample of the cement treated native backfill and transport it to the ESNW soil laboratory for analysis. <br />Remedial Excavation Backfill & Proctor Collection <br />While on site Rep observed the contractor finished hanging miradrain and stego wrap covering the lower third of the shoring <br />wall per the approved post -excavation design. Rep observed the contractor pour a 3' deep 2' wide lift of CDF into a ditch up <br />against the shoring wall. After pouring the CDF Rep observed the contractor place a rubber moisture -stop barrier strip down <br />the center of the CDF per the approved post -excavation design. Rep observed the contractor placed a 12" lift of cement <br />treated backfill over the floor of the excavation and compact it with a sheep's foot style single drum roller and a hoe pack. Rep <br />collected a proctor sample of the cement treated native soil and transported it to the ESNW soil laboratory for analysis. Rep <br />will return to test compaction of this cement treated backfill. Rep observed the remedial excavation was stable in its current <br />configuration and condition. It is recommended that Rep be notified immediately if any changes in the slope conditions are <br />observed. It is the responsibility of the contractor to perform all necessary safety measures in accordance with state and <br />federal regulations. ESNW rep will return daily to observe the condition of the temporarily over -steepened shoring excavation. <br />ESNW Rep will return when requested. <br />Emmett Hartley, G.I.T. <br />ESNW Field Tech <br />(206) 376-4906 <br />