My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1622 E MARINE VIEW DR WHOLE SITE 2022-02-01
>
Address Records
>
E MARINE VIEW DR
>
1622
>
WHOLE SITE
>
1622 E MARINE VIEW DR WHOLE SITE 2022-02-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2022 2:59:04 PM
Creation date
5/5/2021 11:01:10 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
1622
Tenant Name
WHOLE SITE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
932
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Riverview Apartments Stormwater Pollution Prevention Plan <br />2.1.4 Element 4: Install Sediment Controls <br />All stormwater runoff from disturbed areas shall pass through an appropriate sediment removal <br />BMP before leaving the construction site or prior to being discharged to an infiltration facility. <br />Sediment traps and ponds, silt fence, inlet/outlet protections, check dams, and interceptor <br />ditches will be placed as shown on the plans or as directed by the City inspector. <br />In addition, sediment will be removed from paved areas in construction work areas manually or <br />using mechanical sweepers, as needed, to minimize tracking of sediments on vehicle tires away <br />from the site and to minimize wash off of sediments from adjacent streets in runoff. <br />Whenever possible, sediment laden water shall be discharged into onsite, relatively level, <br />vegetated areas (BMP C240 paragraph 5, page 4-102). In some cases, sediment discharge in <br />concentrated runoff can be controlled using permanent stormwater BMPs (e.g., infiltration <br />swales, ponds, trenches). Sediment loads can limit the effectiveness of some permanent <br />stormwater BMPs, such as those used for infiltration or biofiltration; however, those BMPs <br />designed to remove solids by settling (wetvaults or detention tanks) can be used during the <br />construction phase. <br />List and describe BMPs: BMP C152: Sawcutting and Surfacing Pollution Prevention <br />BMP C200: Interceptor Dike and Swale <br />BMP C204: Pipe Slope Drains r <br />BMP C207: Check Dams <br />BMP C209: Outlet Protection <br />BMP C220: Storm Drain Inlet Protection <br />BMP C233: Silt Fence <br />BMP C240: Sediment Trap <br />BMP C241: Temporary Sediment Pond <br />Installation Schedules: <br />Inspection and Maintenance plan: <br />Responsible Staff: <br />CPH Project No. 0024-17-037 August 28, 2018 <br />CP I H CONSULTANTS Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.