Laserfiche WebLink
Riverview Apartments Stormwater Pollution Prevention Plan <br />2.1.4 Element 4: Install Sediment Controls <br />All stormwater runoff from disturbed areas shall pass through an appropriate sediment removal <br />BMP before leaving the construction site or prior to being discharged to an infiltration facility. <br />Sediment traps and ponds, silt fence, inlet/outlet protections, check dams, and interceptor <br />ditches will be placed as shown on the plans or as directed by the City inspector. <br />In addition, sediment will be removed from paved areas in construction work areas manually or <br />using mechanical sweepers, as needed, to minimize tracking of sediments on vehicle tires away <br />from the site and to minimize wash off of sediments from adjacent streets in runoff. <br />Whenever possible, sediment laden water shall be discharged into onsite, relatively level, <br />vegetated areas (BMP C240 paragraph 5, page 4-102). In some cases, sediment discharge in <br />concentrated runoff can be controlled using permanent stormwater BMPs (e.g., infiltration <br />swales, ponds, trenches). Sediment loads can limit the effectiveness of some permanent <br />stormwater BMPs, such as those used for infiltration or biofiltration; however, those BMPs <br />designed to remove solids by settling (wetvaults or detention tanks) can be used during the <br />construction phase. <br />List and describe BMPs: BMP C152: Sawcutting and Surfacing Pollution Prevention <br />BMP C200: Interceptor Dike and Swale <br />BMP C204: Pipe Slope Drains r <br />BMP C207: Check Dams <br />BMP C209: Outlet Protection <br />BMP C220: Storm Drain Inlet Protection <br />BMP C233: Silt Fence <br />BMP C240: Sediment Trap <br />BMP C241: Temporary Sediment Pond <br />Installation Schedules: <br />Inspection and Maintenance plan: <br />Responsible Staff: <br />CPH Project No. 0024-17-037 August 28, 2018 <br />CP I H CONSULTANTS Page 9 <br />