Laserfiche WebLink
the comment periods. All public comments received were reviewed and considered in making this <br />determination. <br />This Mitigated Determination of Non -Significance is specifically conditioned on compliance with the <br />conditions attached hereto which are incorporated by reference as if fully set forth herein. <br />This Final MDNS is issued under WAC 197-11-350. <br />Responsible <br />Official: Allan Giffen, Director Phone: 425.257.8731 <br />Title: Planning Director <br />Address: 2930 Wetmore Avenue, Suite 8-A, Everett, WA 98201 <br />Date: November 7, 2018 <br />Signature: C -L lff�- tom) <br />Appeal Process: You may appeal this determination by filing an appeal on forms provided by the Planning <br />Department and a fee to City of Everett Permit Services Counter at 3200 Cedar Street, 2nd Floor, Everett, <br />WA no later than 14 days from the date the MDNS becomes final, which is by the end of business day on <br />November 21, 2018. Appeal applications and the fee schedule are available online at <br />www.everettwa.gov/planning. Contact Teresa Weldon or Steve ingalsbe at 425-257-8731 to read or ask <br />about the procedures for SEPA appeals. <br />NOTES: <br />1. This MDNS is conditioned on the applicant revising the plan to comply with either: <br />a) the number of off-street parking spaces required under the Zoning Code standards in effect prior to <br />September 19, 2018; or <br />b) the number off-street parking spaces required under the Zoning Code standards that became effective <br />September 19, 2018, including any parking reductions proposed under EMC 19.34.025. <br />See Item 5 under Information for Developer — Planning Department Comments <br />2. A Final MDNS may be withdrawn in the event of significant changes in the proposal, disclosure of new <br />significant information, misrepresentation by the applicant, or failure to comply with the condition upon <br />which this Mitigated Determination of Non -Significance is predicated. <br />3. The issuance of a Final MDNS does not constitute project approval. The applicant must demonstrate and <br />comply with all applicable requirements of Everett's Municipal Code (EMC) prior to receiving any <br />construction permits. <br />3 f <br />City of Everett — Community, Planning and Economic Development <br />Final MDNS SEPA #17-019 <br />