My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Murraysmith Inc. 4/12/2021
>
Contracts
>
6 Years Then Destroy
>
2024
>
Murraysmith Inc. 4/12/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 2:37:24 PM
Creation date
5/6/2021 2:36:07 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Murraysmith Inc.
Approval Date
4/12/2021
Council Approval Date
4/7/2021
End Date
12/31/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
2023 Comprehensive Sewer Plan
Public Works WO Number
3753
Tracking Number
0002889
Total Compensation
$1,495,314.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deliverables <br /> • Flow Monitoring Plan <br /> Assumptions <br /> • Flow monitors data collection period will capture rainfall events to sufficiently complete I/I <br /> analysis. <br /> • Data collection period will be 9 months (July 2021 through March 2022) <br /> • City of Everett data corresponding to flow monitoring period. <br /> Task 5 — Basis of Planning and Regulatory Requirements <br /> Objective <br /> Establish the Basis of Planning for the Plan. Document the regulatory requirements guiding the <br /> Plan, establish the service area, and determine wastewater flows (current and future). <br /> Work Tasks <br /> 5.1 Regulatory Requirements <br /> Review and document the project-specific regulatory requirements and criteria, potential future <br /> requirements/trends, including: <br /> • Previous Planning Efforts— Provide a written summary of recent planning efforts including <br /> those for the Port Gardner Storage Facility (PGSF) and Water Pollution Control Facility <br /> (WPCF) <br /> • Federal, State, and Local Rules and Regulations - Document Federal, State, and local rules <br /> and regulations that relate to the City's sanitary and combined sewer systems, included <br /> the Washington Criteria for Sewerage Works Design ("Orange Book") <br /> • City Design and Construction Standards and Specifications <br /> • In-Lieu-Of Stormwater Control Fee Ordinance No. 3731-20 in the combined sewer area <br /> • Collection System Planning Criteria — Identify planning design criteria, including defining <br /> pipe deficiency criteria. Additional criteria may include pump station firm capacity, force <br /> main maximum velocity, and gravity pipeline minimum scouring velocity. <br /> • System Resiliency Criteria—Define resiliency criteria (likelihood of failure and consequence <br /> of failure) including threat characterization and goals. <br /> City of Everett MURRAYSMITH 2023 Comprehensive Sewer Plan <br /> March 2021 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.