Laserfiche WebLink
302. Permitting Support <br /> Work under this task supports the City on an as needed basis as it applies for construction <br /> permits.The anticipated permits are: <br /> • Building, mechanical, plumbing and demolition <br /> • Electrical <br /> • Public Works <br /> • Water/Sewer Utility <br /> Provided by the City <br /> • Take the lead in permit coordination with Permit Services <br /> Assumptions <br /> • Up to two meetings with Permit Services, attended by one Consultant staff. <br /> Consultant Deliverables <br /> • Calculations and forms as required to support permit application/review <br /> 303. Pre-construction Conference and Construction Meetings <br /> This task includes participation in preconstruction and construction meetings with City staff and <br /> the contractor. General communications with the City (e.g., email, telephone) are ancillary to <br /> other tasks and are not included in this task. <br /> Sub tasks <br /> 303.1 Pre-Construction Conference <br /> Consultant will attend and participate in the City's pre-construction conference. Consultant will <br /> prepare the agenda and a summary of the meeting.The City will finalize and distribute the agenda <br /> and summary. <br /> 303.2 Construction Meetings <br /> Attend construction meetings as requested by the City, such as progress meetings, job <br /> conferences, and other project related meetings. Site meetings will occur over the course of <br /> project construction activities and are anticipated to require Consultant attendance on a weekly <br /> basis. <br /> City of Everett MURRAYSMITH Replacement of Reservoir 2 <br /> April 2021 4 <br /> G\PDX_BD\ChentslEverett,WA\Reservoir 2 9-16(16-1910)1Scope-Fee-Contract\Consr Supt Serv\Exh A2-Everett Reservoir 2 Rplcmnt CSS Scope docx <br />