My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Murraysmith Inc. 5/4/2021 Amendment 2
>
Contracts
>
6 Years Then Destroy
>
2023
>
Murraysmith Inc. 5/4/2021 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 11:30:54 AM
Creation date
5/14/2021 11:30:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Murraysmith Inc.
Approval Date
5/4/2021
Council Approval Date
4/28/2021
End Date
12/31/2023
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Design Svcs for Replacement of Reservoir 2
Public Works WO Number
UP3658
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0001624
Total Compensation
$600,640.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Murraysmith Inc 1/16/2019
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
302. Permitting Support <br /> Work under this task supports the City on an as needed basis as it applies for construction <br /> permits.The anticipated permits are: <br /> • Building, mechanical, plumbing and demolition <br /> • Electrical <br /> • Public Works <br /> • Water/Sewer Utility <br /> Provided by the City <br /> • Take the lead in permit coordination with Permit Services <br /> Assumptions <br /> • Up to two meetings with Permit Services, attended by one Consultant staff. <br /> Consultant Deliverables <br /> • Calculations and forms as required to support permit application/review <br /> 303. Pre-construction Conference and Construction Meetings <br /> This task includes participation in preconstruction and construction meetings with City staff and <br /> the contractor. General communications with the City (e.g., email, telephone) are ancillary to <br /> other tasks and are not included in this task. <br /> Sub tasks <br /> 303.1 Pre-Construction Conference <br /> Consultant will attend and participate in the City's pre-construction conference. Consultant will <br /> prepare the agenda and a summary of the meeting.The City will finalize and distribute the agenda <br /> and summary. <br /> 303.2 Construction Meetings <br /> Attend construction meetings as requested by the City, such as progress meetings, job <br /> conferences, and other project related meetings. Site meetings will occur over the course of <br /> project construction activities and are anticipated to require Consultant attendance on a weekly <br /> basis. <br /> City of Everett MURRAYSMITH Replacement of Reservoir 2 <br /> April 2021 4 <br /> G\PDX_BD\ChentslEverett,WA\Reservoir 2 9-16(16-1910)1Scope-Fee-Contract\Consr Supt Serv\Exh A2-Everett Reservoir 2 Rplcmnt CSS Scope docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.