My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Murraysmith Inc. 5/4/2021 Amendment 2
>
Contracts
>
6 Years Then Destroy
>
2023
>
Murraysmith Inc. 5/4/2021 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 11:30:54 AM
Creation date
5/14/2021 11:30:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Murraysmith Inc.
Approval Date
5/4/2021
Council Approval Date
4/28/2021
End Date
12/31/2023
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Design Svcs for Replacement of Reservoir 2
Public Works WO Number
UP3658
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0001624
Total Compensation
$600,640.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Murraysmith Inc 1/16/2019
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Provided by the City <br /> • Location for pre-construction conference <br /> • Agenda and meeting summary for all Construction Meetings <br /> ■ Participation in all meetings <br /> • Direction to Consultant regarding participation in construction meetings <br /> Assumptions <br /> • The pre-construction conference will be attended by up to three Consultant staff. <br /> ■ Up to two Consultant staff on average will participate in up to 99 construction meetings, <br /> at the direction of the City. <br /> Consultant Deliverables <br /> • Pre-construction conference agenda and meeting summary <br /> 304. Shop Drawings and Submittals Review <br /> At the request of the City, Consultant will: review and comment on shop drawings and other <br /> technical submittals; consider and evaluate any alternatives or substitutions proposed by the <br /> contractor; receive and review other submittals of the contractor including construction <br /> schedules,shop drawings/submittal schedules, lump sum price breakdowns, and other submittals <br /> required by the contract documents; and prepare and maintain a log of submittals received from <br /> the contractor, noting the date received, item submitted on, applicable specification section, <br /> resolution, and their current status. <br /> Provided by the City <br /> • City will take the lead in receiving, reviewing, and responding to contractor submittals and <br /> shop drawings. <br /> • City will provide direction to Consultant regarding involvement in review of shop drawings <br /> and submittals. <br /> Assumptions <br /> • For budgeting purposes, it is assumed that up to a combined total of 70 submittals and <br /> resubmittals will be reviewed by Consultant. <br /> Consultant Deliverables <br /> • Submittal review comments <br /> • Tracking log of submittals received by Consultant <br /> City of Everett MURRAYSMITH Replacement of Reservoir 2 <br /> April 2021 5 <br /> G\PDX BD\Clients\Everett,WA\Reservoir 2 9-16(16-1910)\Scope-Fee-Contract\Const Supt SeMExh A2-Everett Reservoir 2 Rplcmnt CSS Scope docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.